Contacts, documents and full notice history are available with a subscription.
Special Notice NONE Expired 1 notice

Notice to Sole Source Fort Bragg Special Operation Training Facility, North Carolina Microgrid Construction Project W912QR26FTBSOTF

Solicitation W912QR26FTBSOTF Copied Notice ID 1092285c110147aebfb99d2bc2d2bb81 Copied DEPT OF DEFENSE — W072 ENDIST LOUISVILLE
SAM.gov
Posted
Mar 25, 2026
Deadline
Apr 09, 2026
Set-aside
NONE
NAICS
237130
PSC
Y1NZ

Summary

AI-generated · Mar 26, 2026

A microgrid will be constructed at Fort Bragg Special Operations Training Facility, consisting of a 4 MW fixed-tilt PV solar array, at least 6 MW of energy storage, and a new 6 MW diesel generator (with fuel storage and polishing). The system will include a master controller, synchronization controllers, automatic transfer switches, transformers, reclosers, inverters, rectifiers, and underground electrical infrastructure, and will operate on a closed restricted network with interface to the existing SCADA system. Protective relays will be added to the diesel generators, and the installation will island from the main grid to provide extended backup power for mission-critical functions, integrating with the private utility provider’s existing distribution system.

This is a notice of an anticipated sole-source contract with Sandhills Utility Services, Inc., which owns and operates the Fort Bragg electrical infrastructure. The government is seeking capability statements from interested firms to assess ability to execute this project and support the sole-source decision. Submissions should be sent to the Contracting Division POC (Adrienne Manuel), and the email subject should reflect this RFI; this notice is not a solicitation.

In compliance with RFO 5.101 coupled with the guidance set forth by RFO DFARS PGI 206.103-170(d) this Notice for Request for Information is hereby published to inform of the following: The Louisville District intends to award a sole source contract to Sandhills Utility Service, Inc for services to construct a microgrid system at Fort Bragg Special Operations Training Facility in North Carolina that includes a 4-Megawatt (MW) fixed-tilt ground-mounted photovoltaic (PV) solar array, a minimum 6MW/ Energy Storage System (ESS), and a new 6MW diesel generator(s) with fuel storage and a fuel polishing system. The system will feature a master controller, synchronization controllers, automatic transfer switches, transformers, reclosers, inverters, rectifiers, and underground electrical infrastructure. It will be installed on a closed restricted network (CRN), and isolating switches will interface with the existing Supervisory Control and Data Acquisition (SCADA) system. Protective relay controls will be added to the existing 6MW diesel generators. The applicable Size Standard is North American Industry Classification System (NAICS) Code 237130, with a size standard of 45,000,000.00. Estimated period of performance is 990 calendar days. Construction magnitude is more than $50,000,000.00. The construction of the microgrid system will require integration into the utility service provider s extant power infrastructure. The microgrid is designed to provide extended backup power by islanding from the main grid during an outage. Installing this black-start capable microgrid at Fort Bragg will greatly improve the energy security and resilience of the installation and will significantly increase the ability to ensure continuity of operations and mission-essential functions. Sandhills Utility Services, Inc is the sole local utilities provider for the Fort Bragg installation. They own, operate, and maintain the existing utility infrastructure that the new microgrid must connect to, as the microgrid will function as a component of the private utility provider s established electrical distribution system. As the owner and operator of the utility system, Sandhills Utility Services, Inc maintains exclusive ownership, operational control, and authority over the existing infrastructure and is solely authorized to approve, interface, operate, and maintain interconnected systems within its electrical distribution network Sole sourcing the contemplated construction project to the utility provider is expected to attenuate the risk of future stranded assets, in the event that the utility provider does not allow that interface to occur. Sole sourcing directly with the utility provider effectively avoids later disputes concerning conveyance and expedites the transfer of operation and maintenance obligations. Based on the foregoing reasons, it is in the best interest of the government to sole-source the construction project to the private utility provider. This notice does not constitute a solicitation for offers, proposals, etc. However, interested firms must send a capabilities statement NO LATER THAN 11:00AM EDT on 09 April 2026. Capability Statements should be sent to the attention of Adrienne Manuel, Contracting Division POC, at Adrienne.C.Manuel@usace.army.mil Please ensure that the subject line of your email includes "RFI W912QR26FTBSOTF Award is anticipated on or about August 30, 2026. This announcement is in accordance with RFO 5.101(a).

From Special Notice posted on Mar 25, 2026

Notice history

1
  1. Special Notice LATEST Posted Mar 25, 2026 View

Details

Solicitation number W912QR26FTBSOTF
Notice ID 1092285c110147aebfb99d2bc2d2bb81
Notice type Special Notice
Product / Service (PSC) Y1NZ
NAICS 237130
Set-aside No Set aside used
Place of performance Fort Bragg, North Carolina
Archive date Apr 09, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Adrienne Manuel

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION GREAT LAKES AND OHIO
ENDIST LOUISVILLE
W072 ENDIST LOUISVILLE

Place of Performance

Fort Bragg, North Carolina
USA

Dates

Posted Mar 25, 2026 4 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 09, 2026 3 months ago