Notice of Intent Additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland W912DS25S0063
Summary
AI-generated · Aug 26, 2025A sole-source modification to Per Aarsleff Greenland ApS is planned for additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland, under the existing Shoreline Stabilization/Landfill Capping contract. There is no formal solicitation or request for proposal. The scope requires designing and repairing the causeway/shoreline with new gravel cover layers (riprap) on the south side of the causeway for about 500 linear feet, including adding cover layers to existing sloped berms and the causeway, repairing rock jetty roads with new top layers, and repairing the sloped rock armored breakwater with geotextile layers, an underlayment of filter rock, and armor rock with median stones, plus repairing settled foundations and bracing supports for electrical and NSC cable trays and other support structures as needed. If an alternative source is proposed, the vendor must provide data showing it meets the requirements by the due date to the designated contact. This is not a solicitation.
Record 2 notes a construction magnitude estimate of $1,000,000 to $5,000,000, with the same sole-source status and requirements as the prior notice. The rest of the terms remain unchanged, including the process for proposing an alternative source by providing supporting data.
Notice of Intent additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland The New York District, U.S. Army Corps of Engineers intends to award a sole source modification to Per Aarsleff Grnland ApS for additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland, under the existing Shoreline Stabilization/Landfill Capping contract W912DS24C0033. This is not a formal solicitation or request for proposal. This notice of intent is to give notice of the Government's intent to make a sole source award under the authority cited in Federal Acquisition Regulation 6.302-1- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The general requirement is for the contractor to design and repair the area of causeway/shoreline with new gravel cover layers (Riprap) on the south side of the causeway, approximately 500 linear feet. This includes adding new cover layers to existing sloped berms and causeway, repairing rock jetty roads with new top layers, and repairing the sloped rock armored breakwater with geotextile layers, underlayer of filter rock, median stone mass M50 = 25-50 kg, and a cover layer of armor rock, median stone mass 2500 kg. The work also includes repairing settled foundations and bracing supports for the electrical and NSC cable trays, and performing repairs to support structures as needed. Any vendor wishing to propose an alternative source must provide a copy of all relevant data demonstrating the alternative source satisfies the above requirements, by the required due date and time, to Mohenda Surage at: Mohenda.r.surage@usace.army.mil This is not a request to respond to a solicitation.
From Special Notice posted on Aug 13, 2025Notice of Intent additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland The New York District, U.S. Army Corps of Engineers intends to award a sole source modification to Per Aarsleff Grnland ApS for additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland, under the existing Shoreline Stabilization/Landfill Capping contract W912DS24C0033. This is not a formal solicitation or request for proposal. This notice of intent is to give notice of the Government's intent to make a sole source award under the authority cited in Federal Acquisition Regulation 6.302-1- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The general requirement is for the contractor to design and repair the area of causeway/shoreline with new gravel cover layers (Riprap) on the south side of the causeway, approximately 500 linear feet. This includes adding new cover layers to existing sloped berms and causeway, repairing rock jetty roads with new top layers, and repairing the sloped rock armored breakwater with geotextile layers, underlayer of filter rock, median stone mass M50 = 25-50 kg, and a cover layer of armor rock, median stone mass 2500 kg. The work also includes repairing settled foundations and bracing supports for the electrical and NSC cable trays, and performing repairs to support structures as needed. Any vendor wishing to propose an alternative source must provide a copy of all relevant data demonstrating the alternative source satisfies the above requirements, by the required due date and time, to Mohenda Surage at: Mohenda.r.surage@usace.army.mil This is not a request to respond to a solicitation. Magnitude of Construction is estimated to be between $1,000,000.00 - $5,000,000.00.
From Special Notice posted on Aug 14, 2025Notice history
2Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
GRL