Notice of Industry Day for Ediz Hook Beach Nourishment Project W912DW26B0001

Solicitation W912DW26B0001 Copied Notice ID b8e53d1242dd49d99f30f99ae0d6d0f4 Copied DEPT OF DEFENSE — W071 ENDIST SEATTLE
SAM.gov
Posted
Sep 09, 2025
Deadline
Sep 05, 2025
Set-aside
None
NAICS
237990
PSC
Z1PZ

Summary

AI-generated · Aug 25, 2025

Provide construction services to place up to 40,000 tons of 6-12 minus rounded cobble beach fill along the seaward toe of the Ediz Hook armor stone revetment in Port Angeles, WA, to a height of +12 ft MLLW within a 2,900-foot section. The work includes temporarily removing and stockpiling armor stone to accessed the repair area near Sta. 151+00, performing all fill placement and transport with land-based equipment, and then rebuilding the revetment with the stockpiled armor stone after nourishment is placed. Access is via existing roads and the armored slope; all work below the High Tide Line must be completed by 30 September 2026, with the entire project finished by 15 October 2026. Estimated value is $1–$5 million, with construction lasting 4–8 weeks in a single season.

A Virtual Industry Day is scheduled for 05 September 2025 from 10:00 to 10:30 AM PDT to provide project information and gather industry feedback. Feedback on the documents is due by 12 September 2025. Small business program inquiries are available through the district’s Small Business Program.

AGENCY/OFFICE: U.S. Army Corps of Engineers LOCATION: USACE Northwestern Division Seattle (NWS) District TITLE: INDUSTRY DAY Ediz Hook Beach Nourishment Project LOCATION: Virtual - information provided below. DATE: 05 September 2025 TIME: 10:00 AM to 10:30 AM PDT DESCRIPTION: The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day event to provide additional information and gain feedback from industry on the Ediz Hook Beach Nourishment project in Port Angeles, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project. The agency has been tasked to solicit for and award a construction contract to procure and place beach nourishment fill material along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 ft Mean Lower Low Water (MLLW). Up to 40,000 tons of 6 to 12 minus rounded cobble is expected to be placed within a 2,900 ft zone along the revetment. Construction will occur in one season and is expected to last 4-8 weeks based on available funding. Access to repair area would occur over existing roads and over the armored slope of the revetment near the east end of the paper mill near Sta. 151+00. Contractor must temporarily remove and stockpile armor stone to facilitate to the repair area. Upon completion of beach nourishment placement activities, contractor must rebuild the revetment using the stockpiled armor stone. All work (transport and placement) must be performed using land-based equipment. Work is anticipated to begin 16 July 2026. All construction activity below the High Tide Line must be complete by 30 September 2026. The entire project, including cleanup of the premises, must be complete by 15 October 2026. In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is: Between $1,000,000 and $5,000,000. Estimated duration of the actual construction activities is 4-8 weeks. The VIRTUAL Industry Day Event will take place on 05 September 2022 at 10:00 AM PDT via Teams. Below is the link to join this meeting. https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_dc569b2535cb40d395efb2281f2e98c5%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22d7bba062-d8ea-4476-9299-c1e9adc8b209%22%7d Meeting ID: 993 130 529 665 Passcode: Cb35WY7T If you would like to provide feedback for consideration on the documents, please provide them by email to: Mckenna Rain, Contract Specialist, at Mckenna.T.Rain@usace.army.mil by 12 September 2025, 12:00 PM PDT. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project.

From Special Notice posted on Aug 18, 2025

AGENCY/OFFICE: U.S. Army Corps of Engineers LOCATION: USACE Northwestern Division Seattle (NWS) District TITLE: INDUSTRY DAY Ediz Hook Beach Nourishment Project LOCATION: Virtual - information provided below. DATE: 05 September 2025 TIME: 10:00 AM to 10:30 AM PDT DESCRIPTION: The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day event to provide additional information and gain feedback from industry on the Ediz Hook Beach Nourishment project in Port Angeles, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project. The agency has been tasked to solicit for and award a construction contract to procure and place beach nourishment fill material along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 ft Mean Lower Low Water (MLLW). Up to 40,000 tons of 6 to 12 minus rounded cobble is expected to be placed within a 2,900 ft zone along the revetment. Construction will occur in one season and is expected to last 4-8 weeks based on available funding. Access to repair area would occur over existing roads and over the armored slope of the revetment near the east end of the paper mill near Sta. 151+00. Contractor must temporarily remove and stockpile armor stone to facilitate to the repair area. Upon completion of beach nourishment placement activities, contractor must rebuild the revetment using the stockpiled armor stone. All work (transport and placement) must be performed using land-based equipment. Work is anticipated to begin 16 July 2026. All construction activity below the High Tide Line must be complete by 30 September 2026. The entire project, including cleanup of the premises, must be complete by 15 October 2026. In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is: Between $1,000,000 and $5,000,000. Estimated duration of the actual construction activities is 4-8 weeks. The VIRTUAL Industry Day Event will take place on 05 September 2022 at 10:00 AM PDT via Teams. Below is the link to join this meeting. https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_dc569b2535cb40d395efb2281f2e98c5%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22d7bba062-d8ea-4476-9299-c1e9adc8b209%22%7d Meeting ID: 993 130 529 665 Passcode: Cb35WY7T If you would like to provide feedback for consideration on the documents, please provide them by email to: Mckenna Rain, Contract Specialist, at Mckenna.T.Rain@usace.army.mil by 12 September 2025, 12:00 PM PDT. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project.

From Special Notice posted on Sep 09, 2025

Notice history

2
  1. Special Notice Posted Aug 18, 2025 View
  2. Special Notice LATEST Posted Sep 09, 2025
    No changes from previous notice

Details

Solicitation number W912DW26B0001
Notice ID b8e53d1242dd49d99f30f99ae0d6d0f4
Notice type Special Notice
Product / Service (PSC) Z1PZ
NAICS 237990
Place of performance Port Angeles, Washington
Archive date Oct 01, 2025

Award Information

Not yet awarded

Contacts

primary
McKenna Rain

Email

secondary
Robert Gonzalez

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
W071 ENDIST SEATTLE

Place of Performance

Port Angeles, Washington
USA

Dates

Posted Sep 09, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 05, 2025 11 months ago