Contacts, documents and full notice history are available with a subscription.
Special Notice 1 notice 1 document

Notice of Consolidation: Construct Fire Station and Air Passenger Terminal, Demolish Building 1721, Hanscom AFB, MA PANNAD26P0000029528

Solicitation PANNAD26P0000029528 Copied Notice ID e4b45e227d234ad5b9c2d3b0a428cef0 Copied DEPT OF DEFENSE — W2SD ENDIST NEW ENGLAND
SAM.gov
Posted
Feb 03, 2026
Deadline
No deadline
Set-aside
None
NAICS
236220
PSC
Y1QA

Summary

AI-generated · Feb 04, 2026

Construct a new Fire Station at a different Hanscom AFB site: single-story, about 26,325 SF, fully functional with six vehicle bays, living quarters, and administration spaces. It will be built with a concrete foundation, reinforced floor slabs, steel framing, and masonry walls, and will include HVAC, a central fire alarm, and an Emergency Communications Center with Fire and Security Forces Dispatch, plus paving and landscaping.

Construct a new Air Passenger Terminal north of Building 1721: single-story, about 5,150 SF, housing safety offices and a Distinguished Visitors lounge, with pavement for building access and turnaround and sidewalks. The flightline perimeter fence will be re-routed to the new APT location. Demolish Building 1721 (21,270 SF, multi-story) which currently houses the existing fire station, safety offices, APT, and DV lounge, but keep it operating until both new buildings are complete and tenants have moved. Building 1639 (4,241 SF) is an existing abandoned gas station.

Construction of a new Fire Station, new Air Passenger Terminal (APT) and Demolition of Building 1721, Hanscom Air Force Base (AFB), Bedford, MA. The new Fire Station will be constructed at a different site on Hanscom AFB. It will be a single story, 26,325 square foot (SF), fully functional facility. The program includes apparatus bays for six vehicles, living quarters, and administration spaces. Proposed construction will consist of a concrete foundation, reinforced floor slabs, steel framing and masonry walls, HVAC, central fire alarm, Emergency Communications Center with Fire and Security Forces Dispatch, paving, and landscaping. The Air Passenger Terminal building will be constructed north of existing Building 1721 and will be a single story 5,150 SF facility. The Air Passenger Terminal will include the safety offices, Distinguished Visitors lounge, pavement for building access and turnaround, as well as sidewalks. The existing flightline perimeter fence will be re-routed to the new Air Passenger Terminal building location. Building 1721, to be demolished, is an existing multi-story, 21,270 SF, facility that houses the existing fire station, safety offices, air passenger terminal, and Distinguished Visitor lounge. Building 1721 will remain operational until the two new buildings have been completed and the tenants have moved into their new respective buildings. Building 1639 is an existing, 4,241 SF, single story abandoned gas station.

From Special Notice posted on Feb 03, 2026

Notice history

1
  1. Special Notice LATEST Posted Feb 03, 2026

Details

Solicitation number PANNAD26P0000029528
Notice ID e4b45e227d234ad5b9c2d3b0a428cef0
Notice type Special Notice
Product / Service (PSC) Y1QA
NAICS 236220
Place of performance Hanscom AFB, Massachusetts
Archive date Mar 05, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Elizabeth Glasgow

Email

Phone

secondary
Tyler Maryak

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST NEW ENGLAND
W2SD ENDIST NEW ENGLAND

Place of Performance

Hanscom AFB, Massachusetts 01731
USA

Dates

Posted Feb 03, 2026 6 months ago
Last Updated Aug 06, 2026 2 days ago