Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 8 notices 1 document

NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR W912PL25B0004

Solicitation W912PL25B0004 Copied Notice ID b5a04a741d984675900588c28adfaa15 Copied DEPT OF DEFENSE — W075 ENDIST LOS ANGELES
SAM.gov
Posted
Aug 11, 2025
Deadline
Aug 08, 2025
Set-aside
None
NAICS
237990
PSC
Z2KZ

Summary

AI-generated · Aug 25, 2025

Repair a shore-connected rubble-mound breakwater at King Harbor, Redondo Beach. Work includes resetting existing armor stone as needed and furnishing/placing about 8,000 tons of new armor stone with a median size of 14 tons, plus repairing an armor-stone bench on the harborside (elevation +10.0 ft MLLW, 8 ft wide). The goal is to restore the structure to design elevations and slopes in damaged areas. The contract is a large construction project expected to take about 210 days, awarded by sealed bid under FAR Part 14, with plans and specifications available only through the official procurement system (no hard-copy plans). Large-business contractors exceeding $1.5 million must submit a subcontracting plan.

A series of amendments (administrative updates) have been issued to provide site-visit information, update bid-guarantee details, and revise/extend solicitation documents. Changes have included revisions to the solicitation outline and certain plan sheets, and the removal of DoD Safe bid-submission references. Several amendments also adjust the bid-opening timeline, with some notices indicating an extension to August 2025 and others indicating no extension; multiple amendments also transmit additional information such as survey data.

The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Presolicitation posted on Jun 18, 2025

The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Jun 30, 2025

Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Jul 16, 2025

Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Jul 24, 2025

Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Jul 25, 2025

Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Jul 28, 2025

Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Aug 04, 2025

Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

From Solicitation posted on Aug 11, 2025

Notice history

8
  1. Presolicitation Posted Jun 18, 2025 View
  2. Solicitation Posted Jun 30, 2025
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 29, 2025Jul 30, 2025
  3. Solicitation Posted Jul 16, 2025
    • Description: Description was updated
  4. Solicitation Posted Jul 24, 2025
    • Description: Description was updated
  5. Solicitation Posted Jul 25, 2025
    • Description: Description was updated
    • Response Deadline: Jul 30, 2025Aug 08, 2025
  6. Solicitation Posted Jul 28, 2025
    • Description: Description was updated
  7. Solicitation Posted Aug 04, 2025
    • Description: Description was updated
  8. Solicitation LATEST Posted Aug 11, 2025
    No changes from previous notice

Details

Solicitation number W912PL25B0004
Notice ID b5a04a741d984675900588c28adfaa15
Notice type Solicitation
Product / Service (PSC) Z2KZ
NAICS 237990
Archive date Aug 04, 2026

Award Information

Awardee
1

Awardees

Company Name UEI CAGE Code Location
N/A N/A N/A

Documents

1
View on SAM.gov

Contacts

primary
Cameron Stokes

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH PACIFIC
W075 ENDIST LOS ANGELES

Place of Performance

Redondo Beach, Los Angeles County, California
90277

Dates

Posted Aug 11, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 08, 2025 11 months ago