Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 1 document

Norfolk Harbor Southern Branch Maintenance Dredging W9123625BA005

Solicitation W9123625BA005 Copied Notice ID 27d28549b2904e5a91d605c856820c3e Copied DEPT OF DEFENSE — W2SD ENDIST NORFOLK
SAM.gov
Posted
Jun 13, 2025
Deadline
Jun 11, 2025
Set-aside
None
NAICS
237990
PSC
Z1KF

Summary

AI-generated · Aug 25, 2025

Maintenance dredging by mechanical method in segments of the Southern Branch of the Elizabeth River, as part of the Norfolk Harbor Federal Navigation Project, to depths of 41 feet and 36 feet MLLW, with up to 1 foot of overdepth allowed within the contract pay prism. Dredged material will be transported by barge or scow and pumped directly into cells at the Craney Island Dredged Material Management Area (CIDMMA), with an estimated pay volume of about 96,200 cubic yards.

The contractor must dredge within the designated areas to the required depths, transport the material to CIDMMA, discharge it by direct pump-out into the government-furnished placement site, operate and maintain CIDMMA spillways, ensure effluent leaving CIDMMA meets state water quality requirements, and coordinate with Port of Hampton Roads maritime users to minimize impacts to vessel traffic, adjacent utilities, and other dredging operations.

Required work includes maintenance dredging, by mechanical dredging method, segments of the Southern Branch of the Elizabeth River, part of the Norfolk Harbor Federal Navigation Project. The segments are being dredged to required depth of -41 feet and -36 feet MLLW. One foot of allowable overdepth dredging will be part of the contract dredging pay prism.Dredged material generated by the project shall be transported by barge or scow and placed directed into the cell(s) at the Craney Island Dredged Material Management Area (CIDMMA). Dredging is estimated to generate approximately 96,200 cubic yards of available pay volume.The Contractor shall be responsible for the following: dredging within the designated areas to the required and allowable pay depths, transporting the dredged material to the CIDMMA, discharging the material by direct pump-out method into the designated Government- furnished placement site, properly operating and maintaining the spillways within the CIDMMA, ensuring effluent water leaving the CIDMMA meets State water quality requirements, and communicating with the Port of Hampton Roads maritime users to minimize impacts of vessel traffic, adjacent utilities, and other dredging operations.

From Solicitation posted on Jun 13, 2025

Notice history

1
  1. Solicitation LATEST Posted Jun 13, 2025 View

Details

Solicitation number W9123625BA005
Notice ID 27d28549b2904e5a91d605c856820c3e
Notice type Solicitation
Product / Service (PSC) Z1KF
NAICS 237990
Archive date Jun 06, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Stormie Wicks

Email

Phone

secondary
Luke Hedlund

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
W2SD ENDIST NORFOLK

Place of Performance

Hampton Roads, Virginia

Dates

Posted Jun 13, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 11, 2025 1 year ago