NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION W912QR26QA067

Solicitation W912QR26QA067 Copied Notice ID 8d4e99a768034ca882b40eef344bb48b Copied DEPT OF DEFENSE — W072 ENDIST LOUISVILLE
SAM.gov
Posted
Jul 22, 2026
Deadline
Aug 11, 2026
Set-aside
SBA
NAICS
236220
PSC
Y1FB

Summary

AI-generated · Aug 07, 2026

Construct a flush restroom facility at the tailwater recreation area of Nolin River Lake, Kentucky. The contractor will supply all labor, materials, tools, and equipment and handle planning, quantity estimates, administration, supervision, communications, and inspections to complete the work in accordance with the contract and all applicable laws. The prime contractor must ensure subcontractor compliance, and prevailing wage rates apply. The project value is estimated between $100,000 and $250,000, and payment protections are required in lieu of performance and payment bonds, specifically a payment bond or irrevocable letter of credit.

Amendments to the solicitation update the payment protections to allow either a payment bond or an irrevocable letter of credit, and remove bid-guarantee requirements. The offer due date/time has been updated in the bidding systems, and two questions submitted after a site visit have been addressed in the addenda.

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTIONPROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKYTHE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.

From Solicitation posted on Jul 22, 2026

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTIONPROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKYTHE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.***Amendment 0001**** Updated RFO clause 52.228-13 Alternate Payment Protections, section (a) is updated to allow the contractor to submit a Payment Bond or Irrevocable Letter of Credit as a form of payment protection. Offeror due date is updated on PIEE and SAM.gov to 10:00 AM EDT to match box 13(a) and the Special Instructions page of the solicitation. The offeror due date and time remains 10:00 AM EDT on 11 August 2026. Box 13(b) is updated to make an offer guarantee is not required. RFO clauses involving Bid Guarantees are deleted from the solicitation: 52.228-1 Bid Guarantee and 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee).***Amendment 0001*** ***Amendment*** Two (2) questions were received by a potential offeror after a site visit. The amendment provides the questions and answers. ***Amendment 0002***

From Solicitation posted on Aug 07, 2026

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE. 36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00. THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00. IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED. ***Amendment 0001**** Updated RFO clause 52.228-13 Alternate Payment Protections, section (a) is updated to allow the contractor to submit a Payment Bond or Irrevocable Letter of Credit as a form of payment protection. Offeror due date is updated on PIEE and SAM.gov to 10:00 AM EDT to match box 13(a) and the Special Instructions page of the solicitation. The offeror due date and time remains 10:00 AM EDT on 11 August 2026. Box 13(b) is updated to make an offer guarantee is not required. RFO clauses involving Bid Guarantees are deleted from the solicitation: 52.228-1 Bid Guarantee and 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee). ***Amendment 0001*** ***Amendment 0002*** Two (2) questions were received by a potential offeror after a site visit. The amendment provides the questions and answers. ***Amendment 0002***

From Solicitation posted on Aug 07, 2026

Notice history

3
  1. Solicitation Posted Jul 22, 2026
  2. Solicitation Posted Aug 07, 2026
    • Description: Description was updated
  3. Solicitation LATEST Posted Aug 07, 2026
    • Description: Description was updated

Details

Solicitation number W912QR26QA067
Notice ID 8d4e99a768034ca882b40eef344bb48b
Notice type Solicitation
Product / Service (PSC) Y1FB
NAICS 236220
Place of performance Mammoth Cave, Kentucky
Archive date Aug 26, 2026

Award Information

Not yet awarded

Contacts

primary
Joel Huberman

Email

Phone

secondary
Justin Mcpherson

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION GREAT LAKES AND OHIO
ENDIST LOUISVILLE
W072 ENDIST LOUISVILLE

Place of Performance

U.S. Army Corps of EngineersNolin River Lake2150 Nolin Dam RoadMammoth Cave, KY 42259
Mammoth Cave, Kentucky 42259
USA

Dates

Posted Jul 22, 2026 2 weeks ago
Last Updated Jul 24, 2026 2 weeks ago
Due Aug 11, 2026 3 days from now