NM BR AAO EL VADO HERON & EL VADO ROAD REHAB 6982AF25B000003
Summary
AI-generated · Nov 13, 2025Rehabilitate the surfacing and improve parking lot operations across El Vado State Park (State Park Road 5001) and Heron Lake State Park (Willow Creek access and related parking). The project includes full-depth reclamation of about 5.23 miles of asphalt roadway (4.61 miles on SP Road 5001 and 0.62 mile on the Willow Creek Access Road), plus full-depth reclamation for three paved parking lots and paving of an existing gravel lot, along with curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements (culvert cleaning). Work is split into Schedule A (State Park Road 5001) and Option X (access roads/parking within Heron Lake SP); it is a total small business set aside, and bid plans and specifications are available.
Key items include 78,000 square yards of FDR with cement (4-inch depth), 13,000 tons of asphalt pavement, 75 tons of prime coat (Method 1), 55 tons of fog seal, 33 miles of pavement markings (Type B, solid), 500 cubic yards of roadway excavation, 2,100 tons of roadway aggregate (Method 2), 60 square yards of concrete sidewalk, and 15 culvert cleanings in place.
NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Heron Lake State Park Willow Creek Boat Ramp Parking Lot, Heron Lake State Park Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place
From Solicitation posted on Nov 12, 2025NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Heron Lake State Park Willow Creek Boat Ramp Parking Lot, Heron Lake State Park Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place
From Solicitation posted on Dec 08, 2025NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Heron Lake State Park Willow Creek Boat Ramp Parking Lot, Heron Lake State Park Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place
From Solicitation posted on Dec 09, 2025NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Heron Lake State Park Willow Creek Boat Ramp Parking Lot, Heron Lake State Park Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place
From Solicitation posted on Dec 12, 2025NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Heron Lake State Park Willow Creek Boat Ramp Parking Lot, Heron Lake State Park Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place
From Solicitation posted on Mar 05, 2026Notice history
5-
Solicitation Posted Nov 12, 2025
-
Solicitation Posted Dec 08, 2025No changes from previous notice
-
Solicitation Posted Dec 09, 2025No changes from previous notice
-
Solicitation Posted Dec 12, 2025No changes from previous notice
-
Solicitation LATEST Posted Mar 05, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA