Contacts, documents and full notice history are available with a subscription.
Sources Sought SBA Expired 1 notice 3 documents

NIST Boulder Galvanized Steel Stair Installation – Building 2 Mechanical Room NB194000-26-00857

Solicitation NB194000-26-00857 Copied Notice ID 06a9d8f39b64473398fd5218fe2e0d1c Copied COMMERCE, DEPARTMENT OF — DEPT OF COMMERCE NIST
SAM.gov
Posted
Mar 13, 2026
Deadline
Mar 27, 2026
Set-aside
SBA
NAICS
236220
PSC
Z2JZ

Summary

AI-generated · Mar 14, 2026

Qualified small business contractors are sought to remove and dispose of two existing wooden stair assemblies in the lower-level mechanical room of Building 2 at the NIST Boulder Campus (one 5-riser staircase and one 9-riser staircase) and to fabricate and install new galvanized steel stair assemblies. Because access is restricted, the replacements must be field-fabricated and installed in place, including on-site welding.

The new stairs must include slip-resistant industrial treads, code-compliant handrails and guardrails, and be securely anchored to the existing structure. Work includes coordinating with surrounding mechanical, electrical, and plumbing systems, protecting adjacent surfaces, performing cleanup and debris removal, and complying with applicable building codes, OSHA regulations, and NIST safety and security requirements.

The National Institute of Standards and Technology (NIST) Boulder Campus seeks qualified small business contractors capable of performing a construction project to remove and replace two existing stair assemblies located in the lower-level mechanical room of Building 2. Work includes demolition and legal disposal of one (1) existing 5-riser wooden staircase and one (1) existing 9-riser wooden staircase and fabrication and installation of new galvanized steel stair assemblies. Due to restricted access within the mechanical room, the stair assemblies must be field-fabricated and installed in place, including required on-site welding. The new stair systems shall include slip-resistant industrial treads and code-compliant handrails and guardrails, and shall be securely anchored to the existing structure. Work also includes coordination with existing mechanical, electrical, and plumbing systems; protection of adjacent surfaces; cleanup and debris removal; and compliance with applicable building codes, OSHA regulations, and NIST safety and security requirements.

From Sources Sought posted on Mar 13, 2026

Notice history

1
  1. Sources Sought LATEST Posted Mar 13, 2026

Details

Solicitation number NB194000-26-00857
Notice ID 06a9d8f39b64473398fd5218fe2e0d1c
Notice type Sources Sought
Product / Service (PSC) Z2JZ
NAICS 236220
Place of performance Boulder, Colorado
Archive date Apr 11, 2026

Award Information

Not yet awarded

Contacts

primary
Lauren Lopez

Email

secondary
Travis Zoellner

Email

Agency

COMMERCE, DEPARTMENT OF
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
DEPT OF COMMERCE NIST

Place of Performance

Boulder, Colorado 80305
USA

Dates

Posted Mar 13, 2026 4 months ago
Last Updated Aug 06, 2026 2 days ago
Due Mar 27, 2026 4 months ago