NIST Boulder Building 2 1330 Fume Hood Replacement NB196000-26-00864
Summary
AI-generated · Mar 09, 2026Contractors capable of performing construction services to replace an existing laboratory fume hood and rooftop exhaust system in Building 2, Room 1330, at the NIST Boulder Campus, are sought. Replace the 1992 tabletop fume hood with a new walk-in fume hood and hazardous exhaust fan to support newer research with larger equipment and toxic gases. Work includes architectural, mechanical, plumbing, electrical, and fire alarm modifications, such as removing and replacing countertops, sink, plumbing connections, ductwork, the rooftop exhaust fan, electrical circuits, cable trays, and lightning protection, plus installing a panic alarm system integrated with the building fire alarm.
Additionally, provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The project is expected to last about six months from award.
The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated period of performance is approximately six months from the date of award.
From Sources Sought posted on Mar 04, 2026Notice history
1Details
Award Information
Not yet awarded