NIST Boulder Building 2 1330 Fume Hood Replacement 1333ND26RNB190028
Summary
AI-generated · Jun 30, 2026Replace an existing laboratory fume hood and rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus, including demolition and replacement of adjacent countertops, sink, base cabinetry, plumbing connections, and finishes. Mechanical work covers removal of the old fume hood, ductwork, and rooftop exhaust fan, and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and associated duct connections.
Electrical, plumbing, and life-safety work accompany the project: reconfiguring circuits for the hood and exhaust, adding cable tray and dedicated receptacles for lab equipment, reconnecting lightning protection and bonding; reconnecting piping to a new sink and eyewash; installing a supervised fume hood panic alarm connected to the building fire alarm panel; providing structural design and installation of exhaust stack supports; and performing ASHRAE 110 performance testing. Site access is via a mandatory site visit with registration required per Instructions to Offerors; questions and bid submissions follow the stated process. Coordinate all construction activities with NIST personnel.
The project consists of construction services to remove and replace an existing laboratory tabletop fume hood and associated rooftop exhaust fan located in Building 2, Room 1330 at the NIST Boulder Campus. Work will include demolition and replacement of existing countertops, sink, base cabinetry, plumbing connections, and associated architectural finishes. Mechanical work includes removal of the existing fume hood, ductwork, and rooftop exhaust fan and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and duct connections. Electrical work includes removal and installation of circuits serving the fume hood and exhaust fan, installation of cable tray and dedicated receptacles for laboratory equipment, reconnection of lightning protection systems, and bonding of the hood and exhaust system. Plumbing work includes reconnecting existing piping to a new sink and eyewash station. Fire alarm work includes installation of a supervised fume hood panic alarm system connected to the building fire alarm panel. The contractor will also provide structural design and installation of exhaust fan stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. Important Dates: List of Individuals due for Site Visit: Monday, June 15, 2026 Site Visit: Wednesday, June 17, 2026 @ 2:30 PM outside Building 2 Questions Due: Monday, June 22, 2026 Proposals Due: Thursday, July 23, 2026 Please see Instructions to Offerors on Page 111 of the solicitation for details around registering for the site visit.
From Combined Synopsis/Solicitation posted on Jun 29, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Jun 29, 2026
Details
Award Information
Not yet awarded
Documents
7Contacts
Agency
Place of Performance
USA