Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 7 documents

NIST Boulder Building 2 1330 Fume Hood Replacement 1333ND26RNB190028

Solicitation 1333ND26RNB190028 Copied Notice ID 338eb9d4d12c4a70b0bef7a8cac7a60e Copied COMMERCE, DEPARTMENT OF — DEPT OF COMMERCE NIST
SAM.gov
Posted
Jun 29, 2026
Deadline
Jul 23, 2026
Set-aside
SBA
NAICS
236220
PSC
Z2AA

Summary

AI-generated · Jun 30, 2026

Replace an existing laboratory fume hood and rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus, including demolition and replacement of adjacent countertops, sink, base cabinetry, plumbing connections, and finishes. Mechanical work covers removal of the old fume hood, ductwork, and rooftop exhaust fan, and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and associated duct connections.

Electrical, plumbing, and life-safety work accompany the project: reconfiguring circuits for the hood and exhaust, adding cable tray and dedicated receptacles for lab equipment, reconnecting lightning protection and bonding; reconnecting piping to a new sink and eyewash; installing a supervised fume hood panic alarm connected to the building fire alarm panel; providing structural design and installation of exhaust stack supports; and performing ASHRAE 110 performance testing. Site access is via a mandatory site visit with registration required per Instructions to Offerors; questions and bid submissions follow the stated process. Coordinate all construction activities with NIST personnel.

The project consists of construction services to remove and replace an existing laboratory tabletop fume hood and associated rooftop exhaust fan located in Building 2, Room 1330 at the NIST Boulder Campus. Work will include demolition and replacement of existing countertops, sink, base cabinetry, plumbing connections, and associated architectural finishes. Mechanical work includes removal of the existing fume hood, ductwork, and rooftop exhaust fan and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and duct connections. Electrical work includes removal and installation of circuits serving the fume hood and exhaust fan, installation of cable tray and dedicated receptacles for laboratory equipment, reconnection of lightning protection systems, and bonding of the hood and exhaust system. Plumbing work includes reconnecting existing piping to a new sink and eyewash station. Fire alarm work includes installation of a supervised fume hood panic alarm system connected to the building fire alarm panel. The contractor will also provide structural design and installation of exhaust fan stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. Important Dates: List of Individuals due for Site Visit: Monday, June 15, 2026 Site Visit: Wednesday, June 17, 2026 @ 2:30 PM outside Building 2 Questions Due: Monday, June 22, 2026 Proposals Due: Thursday, July 23, 2026 Please see Instructions to Offerors on Page 111 of the solicitation for details around registering for the site visit.

From Combined Synopsis/Solicitation posted on Jun 29, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 29, 2026

Details

Solicitation number 1333ND26RNB190028
Notice ID 338eb9d4d12c4a70b0bef7a8cac7a60e
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2AA
NAICS 236220
Place of performance Boulder, Colorado
Archive date Aug 07, 2026

Award Information

Not yet awarded

Contacts

primary
Lauren Lopez

Email

secondary
Travis Zoellner

Email

Agency

COMMERCE, DEPARTMENT OF
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
DEPT OF COMMERCE NIST

Place of Performance

Boulder, Colorado 80305
USA

Dates

Posted Jun 29, 2026 1 month ago
Last Updated Aug 07, 2026 1 day ago
Due Jul 23, 2026 2 weeks ago