NFPC Sand Disposal N6449826Q5003
Summary
AI-generated · Nov 07, 2025Remove bulk silica sand from two vaults at the Naval Foundry & Propeller Center to enable repurposing after silo upgrades. Vaults measure approximately 240 (Length) x 120 (Width) x 120 (Height) and contain about 252 tons of sand that must be emptied.
Work must comply with confined-space entry requirements, and only workers who are confined-space trained may perform the task. Full details are provided in the attached solicitation.
See attached solicitation for full details. The Naval Foundry & Propeller Center require sand removal service. NFPC has two vaults in need of empting in order for supervision to repurpose the vaults. The vaults once used for silica sand transportation cannot be utilized in the same manner due to current silo upgrade. The contractor shall remove bulk sand from two (2) vaults that measure approximately 240 Length x 120 Width x 120 Height, approximately total of 252 ton of sand. The contractor is required to follow confined space requirements. The contractor shall only provide confined space trained workers.
From Combined Synopsis/Solicitation posted on Nov 06, 2025See attached solicitation for full details. The Naval Foundry & Propeller Center require sand removal service. NFPC has two vaults in need of empting in order for supervision to repurpose the vaults. The vaults once used for silica sand transportation cannot be utilized in the same manner due to current silo upgrade. The contractor shall remove bulk sand from two (2) vaults that measure approximately 240 Length x 120 Width x 120 Height, approximately total of 252 ton of sand. The contractor is required to follow confined space requirements. The contractor shall only provide confined space trained workers.
From Combined Synopsis/Solicitation posted on Nov 07, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Nov 07, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA