New Poinsett Tower Installation FA480326R0007
Summary
AI-generated · Feb 13, 2026Construct a new 120-foot tower at the Poinsett Range in Wedgefield, SC, and move existing equipment to the new tower to improve coverage and reduce dead spots. The scope includes the tower, antennas and antenna cables, an ice bridge between the shelter and the antenna, and a ground ring tied into the shelter grounding. The contractor will plan, design, construct, and manage all activities required to meet the objectives in the Statement of Objectives, with performance evaluated against defined outcomes and acceptance criteria; the government will not direct construction means and methods. Offerors must develop the detailed technical approach and supporting documentation necessary to satisfy the SOO.
This is a sources sought for market research and planning; no solicitation is issued at this time, and no contract award will result from this notice. Responses should include company information, a capabilities statement, and an assessment of ability to perform at the Poinsett Range, along with any other items requested in the SOO. Submissions are to be sent via email to the designated government contacts with the specified subject line; costs incurred in responding will not be reimbursed.
1. Description: This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs to build a new 120ft tower at the Poinsett Range and move the existing equipment to the new tower in accordance with the Statement of Objectives. This requirement is for a construction contract to replace an existing structure and is expected to increase coverage to the range by reducing dead spots. This project will include a new tower, antennas, antenna cables, ice bridge between the shelter and antenna, and ground ring tied into the shelter ground. The Contractor shall be responsible for planning, designing, constructing, and managing all activities necessary to achieve the objectives of the attached Statement of Objectives (SOO). The Government will not direct or control the Contractor s construction means and methods but will evaluate performance based on compliance with the objectives and acceptance criteria defined herein. The purpose of the attached SOO is to define the objectives, performance outcomes, and constraints for the construction effort while allowing Offerors the flexibility to propose effective and innovative design and construction solutions. The Contractor shall develop the detailed technical approach and supporting documentation necessary to meet the objectives of the SOO. Please refer to attached SOO and all attachments for details. 2. Submission Requirements:Interested vendors are invited to submit the following information: Company Information Company name, address, and point of contact (name, email, phone) CAGE code and UEI (if available) Applicable NAICS codes Capabilities Statement Description of your ability to fulfill the listed requirements in the statement of Objectives Indicate your ability to perform at the Poinsett Range in Wedgefield, SC. 3. Submission Instructions: Response Deadline: 20 Febuary 2026, 2:00 PM EST Submission Method: Email responses to both joshua.lamb.7@us.af.mil and hutton.cobb@us.af.mil Subject Line: Sources Sought Response - New Poinsett Tower Installation. Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.
From Sources Sought posted on Feb 12, 2026Notice history
1-
Sources Sought LATEST Posted Feb 12, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA