Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 8 documents

New Manufacture of Cylinder Assembly FA8118-25-R-0058

Solicitation FA8118-25-R-0058 Copied Notice ID 598cab138e70470c9b15536fdf59a95a Copied DEPT OF DEFENSE — FA8118 AFSC PZABB
SAM.gov
Posted
Jun 02, 2025
Deadline
Jul 16, 2025
Set-aside
None
NAICS
336413
PSC
1680

Summary

AI-generated · Aug 25, 2025

Manufacture new B-2 cylinder assemblies (NSN 1680-01-350-2780) under a firm-fixed-price contract as a spare buy, with a sole-source award anticipated to Technetics Group Daytona, Inc. Production quantity is 23 units, plus associated First Article units as required. Vendors not previously qualified must submit a Source Approval Request (SAR) to the Source Development, Small Business Office; copies of Tech Order Manuals may be requested, and bidders must provide a fully executed DD Form 2345 with any Tech Order requests.

First Article requirements include a First Article Test Report due 120 days after contract award, with Technetics notifying DCMA 3 calendar days prior to shipment of the First Article asset and the Government issuing disposition within 90 days after receipt. Production delivery of the 23 new manufacture assets is due 30 days after First Article approval and submission of the First Article Test Report. The First Article package must include certifications for all hardware/material, dimensional check worksheets, calibration certificates for measuring instruments, certifications for any non-contracted work, and complete job travelers detailing the process. Submit the First Article Test Report to the Government (AFLCMC/LZPED); three approved First Article assets will be delivered with the balance of the contract. Bidders must certify adherence to NIST SP 800-171, with SPRS showing a current DoD assessment score of 110; if below 110, a remediation plan must be submitted with the proposal.

FIRST ARTICLE AND NEW MANUFACTURE B-2 CYLINDER ASSEMBLY (NSN: 1680-01-350-2780) THIS IS A FIRM FIXED PRICE, SPARE BUY. IT IS ANTICIPATED THAT THIS ACTION WILL BE A SOLE SOURCE AWARD TO Technetics Group Daytona, Inc. (Cage: 07582) NSN QUANTITY PRICE (EA) TOTAL 1680-01-350-2780 23 EA 1680-01-350-2780 1 EA First Article 1680-01-350-2780 2 EA First Article Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office at 405-739-7243. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. Copies of Tech Order Manuals may be requested. It is the contractor s responsibility to provide a fully executed copy of the DD Form 2345 with all requests for Tech Orders. This office is not responsible for untimely or misdirected requests. In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a plan with their proposal to become compliant. FIRST ARTICLE REQUIREMENTS: (a) First Article Test Report to be delivered 120 days from the date of contract award. Technetics Group is to send notification to DCMA 3 calendar days prior to shipment of First Article asset. The Government will provide written notice of approval/disapproval within 90 days after receipt of the First Article package. Delivery of new manufacture assets (23 each) to be delivered 30 days after approval of First Article asset and submission of First Article Test Report. (b) First article test report should include but not limited to: 1. Certifications for all purchased hardware/material. 2. Dimensional check worksheet. 3. A copy of the latest calibration certifications for all measuring instruments used to perform the dimensional checks. 4. Certifications for any work not performed by the contractor, if applicable. 5. Job travelers. Job travelers should include process from start to finish, even if the first article is requested without coatings. 6. Results of all testing requirements indicated on drawing. (c) Submit First Article Test Report to: Government: FA8111 AFLCMC/LZPED Note: Upon completion of First Article testing, additional disposition instructions will be provided by the Government Engineer, Contracting Officer or Contract Specialist via email. (d) Approved First Article asset (3 each) will be delivered to the Government with the balance of the contract.

From Solicitation posted on Jun 02, 2025

Notice history

1
  1. Solicitation LATEST Posted Jun 02, 2025 View

Details

Solicitation number FA8118-25-R-0058
Notice ID 598cab138e70470c9b15536fdf59a95a
Notice type Solicitation
Product / Service (PSC) 1680
NAICS 336413
Place of performance USA
Archive date Jul 31, 2025

Award Information

Not yet awarded

Contacts

primary
Amy Gil

Email

secondary
Dessie Breslin

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8118 AFSC PZABB

Place of Performance


USA

Dates

Posted Jun 02, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 16, 2025 1 year ago