New Laundry Facility at Holston Army Ammunition Plant W9123625R4000
Summary
AI-generated · Aug 25, 2025Design and construct a new on-site Laundry Facility at Holston Army Ammunition Plant to support routine and specialty laundering of worker garments and production-area fabrics used in explosives production operations, at a GOCO explosives facility environment. The project includes integrating new and relocated laundry equipment and related support spaces.
The building will include equipment such as a scale, hot water tanks with controls, multiple washers/extractors, and dryers, plus cutting and sewing rooms, clothing storage, bathrooms, a boiler room, and a breakroom. Ramps and a loading dock are required for safe transport of wheeled buggies within the building and to/from change houses. The design-build contractor is responsible for obtaining all necessary permits.
The USACE Norfolk District has a requirement from the JPEOAA to provide design and construction of a new Laundry Facility at the Holston Army Ammunition Plant (HSAAP).HSAAP is a Government-Owned, Contractor Operated (GOCO) explosives production facility located in Kingsport, TN. HSAAP depends on an onsite Laundry Facility to support routine and specialty laundering requirements of a variety of worker garments and production area fabrics utilized in conjunction with explosives production operations. The new Laundry Facility will house new and relocated laundry equipment. Laundry equipment will comprise of a scale, hot water tank(s) with controls, several washer/extractors, and dryers. In addition to the equipment area, the new building will include cutting and sewing rooms, clothing storage, bathrooms, a separate boiler room (as required) and breakroom. Ramps and loading dock are required for safe transport of wheeled buggies within the building and to/from change houses. The DB Contractor will be responsible for obtaining all necessary permits for the project.
From Solicitation posted on Jul 18, 2025The Army Corps of Engineers Norfolk District is announcing the award for the New Laundry Facility at Holston Army Ammunition Plant in support Norfolk District's Ammunition Program. The Government awarded one (1) contract with a firm fixed price of $17,021,678.00. The awardee is as follows: W9123625CA007 Richard Group LLC, Suite 100, 566 W Lake Street, Chicago, IL 60661-1412 POC: Jed Richard, email: Jed.Richard@RichardGroupLLC.com, Ph: 8474718294
From Award Notice posted on Sep 24, 2025Notice history
2-
Solicitation Posted Jul 18, 2025
-
Award Notice LATEST Posted Sep 24, 2025
Details
Award Information
Award Notices
Posted: Sep 24, 2025
The Army Corps of Engineers Norfolk District is announcing the award for the New Laundry Facility at Holston Army Ammunition Plant in support Norfolk District's Ammunition Program. The Government awarded one (1) contract with a firm fixed price of $17,021,678.00. The awardee is as follows: W9123625C...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| RICHARD GROUP LLC | QST7A5N63TL4 | 77PV6 | Chicago, IL |
| N/A | N/A | N/A |
Contacts
Phone
Agency
Place of Performance
37660