Contacts, documents and full notice history are available with a subscription.
Award Notice SBA 3 notices

New Boat Dock at Eufaula Lake,OK W912BV25QA032

Solicitation W912BV25QA032 Copied Notice ID 791dc3713dc8401c881497eabd7f6ceb Copied DEPT OF DEFENSE — W076 ENDIST TULSA
SAM.gov
Posted
Aug 01, 2025
Deadline
Aug 22, 2025
Set-aside
SBA
NAICS
237990
PSC
Y1JZ

Summary

AI-generated · Aug 24, 2025

Construct and install a new enclosed dock at Eufaula Lake, OK, featuring a main dock of 20' x 32' with a 12' x 26' slip, four fingers, a 6 HP boat lift, electric roll-up door at the slip opening, an entry door at the bridge, composite decking, and a 4' x 50' bridge.

The second notice clarifies the project is a total small-business set-aside and, per FAR 36.204, the estimated magnitude of construction is between $100,000 and $250,000.

The U.S. Army Corps of Engineers - Tulsa District - Eufaula Lake, OK has a requirement for the construction and installation of a new enclosed 20?x 32? Dock with 12?x 26? Slip, 4? Fingers, 6? HP, electric roll-up Door at slip opening, entry door at Bridge, Composite Decking, boat lift, and a 4?x 50? Bridge.

From Solicitation posted on Aug 01, 2025

The U.S. Army Corps of Engineers - Tulsa District - Eufaula Lake, OK has a requirement for the construction and installation of a new enclosed 20?x 32? Dock with 12?x 26? Slip, 4? Fingers, 6? HP, electric roll-up Door at slip opening, entry door at Bridge, Composite Decking, boat lift, and a 4?x 50? Bridge.This is a total small business set aside.In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $100,000 and $250,000.

From Solicitation posted on Aug 22, 2025

The U.S. Army Corps of Engineers - Tulsa District - Eufaula Lake, OK has a requirement for the construction and installation of a new enclosed 20?x 32? Dock with 12?x 26? Slip, 4? Fingers, 6? HP, electric roll-up Door at slip opening, entry door at Bridge, Composite Decking, boat lift, and a 4?x 50? Bridge.This is a total small business set aside.In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $100,000 and $250,000.

From Award Notice posted on Sep 24, 2025

Notice history

3
  1. Solicitation Posted Aug 01, 2025
  2. Solicitation Posted Aug 22, 2025
    • Description: Description was updated
    • Response Deadline: Aug 22, 2025Aug 29, 2025
  3. Award Notice LATEST Posted Sep 24, 2025

Details

Solicitation number W912BV25QA032
Notice ID 791dc3713dc8401c881497eabd7f6ceb
Award number W912BV25PA032
Notice type Solicitation
Product / Service (PSC) Y1JZ
NAICS 237990
Archive date Sep 06, 2025

Award Information

Awardee
1
Total Awarded
$148,879.00
Award Date
Sep 24, 2025

Award Notices

New Boat Dock at Eufaula Lake,OK View Notice

Posted: Sep 24, 2025

The U.S. Army Corps of Engineers - Tulsa District - Eufaula Lake, OK has a requirement for the construction and installation of a new enclosed 20?x 32? Dock with 12?x 26? Slip, 4? Fingers, 6? HP, electric roll-up Door at slip opening, entry door at Bridge, Composite Decking, boat lift, and a 4?x 50?...

Awardees

Company Name UEI CAGE Code Location
TECH SERVICE SOLUTIONS LLC UKZDZ3TPMLU1 91QC4 Phoenix, AZ

Documents

No files available

View on SAM.gov

Contacts

primary
Lee Maddox

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTHWESTERN
W076 ENDIST TULSA

Place of Performance

U.S. Army Corps of EngineersEufaula Lake Project Office102 E. BK 200 Rd.Stigler, Oklahoma, 74462
74462

Dates

Posted Aug 01, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 22, 2025 11 months ago