Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 5 documents

Negrito Well Install New Mexico 127EAV25Q0081

Solicitation 127EAV25Q0081 Copied Notice ID 5247db4ed5054a5fb5c63d4b861b2ddd Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA SOUTHWEST 5
SAM.gov
Posted
Sep 29, 2025
Deadline
Sep 30, 2025
Set-aside
SBA
NAICS
221310
PSC
Z2NE

Summary

AI-generated · Sep 28, 2025

Replace the irreparable Negrito Fire Base water system by constructing a new well at the site. The work includes drilling, installing casing, surface preparation, and complete assembly of a functional water system; the new well should be as close as feasible to the existing well and connected into the current distribution system.

Must comply with all applicable federal, state, and local regulations. The contractor is responsible for all labor, tools, equipment, permitting, and materials needed to complete the project.

The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include drilling, casing installation, surface prep, and complete assembly of a functional water system. All work must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials.

From Combined Synopsis/Solicitation posted on Sep 25, 2025

The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include drilling, casing installation, surface prep, and complete assembly of a functional water system. All work must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials.

From Combined Synopsis/Solicitation posted on Sep 29, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Sep 25, 2025 View
  2. Combined Synopsis/Solicitation LATEST Posted Sep 29, 2025
    No changes from previous notice

Details

Solicitation number 127EAV25Q0081
Notice ID 5247db4ed5054a5fb5c63d4b861b2ddd
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2NE
NAICS 221310
Place of performance Reserve, New Mexico
Archive date Oct 15, 2025

Award Information

Not yet awarded

Contacts

primary
Ernest Hernandez

Email

secondary
Harley Allsup

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA SOUTHWEST 5

Place of Performance

Reserve, New Mexico
USA

Dates

Posted Sep 29, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 30, 2025 10 months ago