Negrito Well 1153055
Summary
AI-generated · Sep 16, 2025Replace an irreparable well at Negrito Fire Base by constructing a new well. The project includes drilling, installing casing, surface preparation, and assembling a complete, functional water system, and must comply with all applicable federal, state, and local regulations. The new well should be located as close as feasible to the existing well and connected into the current distribution system. The contractor will supply all labor, tools, equipment, permitting, and materials. The work must be completed by the required deadline.
The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include drilling, casing installation, surface prep, and complete assembly of a functional water system. All work must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials. PERIOD OF PERFORMANCE: Must be completed by 10 November 2025
From Sources Sought posted on Sep 15, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA