Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 6 notices 11 documents

ND FLAP SDN 7NE(1) Hoffer Lake Access 6982AF25B000017

Solicitation 6982AF25B000017 Copied Notice ID 5f8dfa9c7176471394fb48423e874094 Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Dec 11, 2025
Deadline
Nov 19, 2025
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Sep 11, 2025

Widen and pave 1.06 miles of 7th Street NE from 5th Avenue NE to the main park entrance and through Hoffer Lake Park to the west end near an unmarked intersection, to improve access and visitor experience at Hoffer Lake Park. The design reduces the speed within the park to 25 mph to allow for a 0-foot clear zone; the pavement will be 24 feet wide (11-foot lanes with 1-foot shoulders); grading will be adjusted to fit on the existing road bench to minimize material import and wetlands impacts; reconditioning work is not included due to the project’s 4R earthwork scope. Plan and specifications are not available, and this is a presolicitation.

Principal work items include road excavation about 6,000 cubic yards; waste about 3,952 cubic yards; aggregate base about 6,000 tons; asphalt concrete pavement about 3,500 tons; pavement markings about 8 miles; and temporary traffic control. The estimated project cost ranges from $2,000,000 to $5,000,000.

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: ND FLAP SDN 7NE(1) PROJECT NAME: Hoffer Lake Access DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM ANTICIPATED SCHEDULE: Advertisement September 2025 Award November 2025 NTP November 2025 Contract Completion September 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000

From Presolicitation posted on Sep 10, 2025

PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM

From Solicitation posted on Nov 10, 2025

PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM

From Solicitation posted on Nov 12, 2025

PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM

From Solicitation posted on Nov 17, 2025

PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM

From Solicitation posted on Nov 19, 2025

PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM

From Solicitation posted on Dec 11, 2025

Notice history

6
  1. Presolicitation Posted Sep 10, 2025 View
  2. Solicitation Posted Nov 10, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Sep 25, 2025Nov 12, 2025
  3. Solicitation Posted Nov 12, 2025
    • Response Deadline: Nov 12, 2025Nov 19, 2025
  4. Solicitation Posted Nov 17, 2025
    No changes from previous notice
  5. Solicitation Posted Nov 19, 2025
    No changes from previous notice
  6. Solicitation LATEST Posted Dec 11, 2025
    No changes from previous notice

Details

Solicitation number 6982AF25B000017
Notice ID 5f8dfa9c7176471394fb48423e874094
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance McClusky, North Dakota
Archive date Dec 30, 2025

Award Information

Not yet awarded

Contacts

primary
Stephanie Navarro

Email

secondary
Kelly Palmer

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

McClusky, North Dakota 58463
USA

Dates

Posted Dec 11, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Nov 19, 2025 8 months ago