NAVSUP Emergency Backup Generator N00189GENERATOR
Summary
AI-generated · Aug 24, 2025Delivery and commissioning of a fully operational emergency backup mobile generator system to ensure continuous power at Naval Ammunitions Logistic Center during outages, powering essential systems and personnel engaged in critical ordnance logistics functions (inventory management, transportation/distribution management, operational/contingency planning, and ordnance safety management) that support operational readiness for Navy, Marine Corps, Coast Guard, and SOCOM warfighters using the Ordnance Information System Wholesale (OIS-W) on the SIPR Network.
Provide all necessary equipment, materials, labor, and services per the Statement of Work; supply training to designated government personnel on operation and maintenance of the generator system; and perform a load bank test upon delivery prior to acceptance, with the testing results provided to designated government personnel.
Naval Supply Systems Command Headquarters (NAVSUP HQ) requires a reliable emergency backup generator to ensure continuous operation of critical infrastructure at Naval Ammunitions Logistic Center (NALC) during power outages. This generator will provide power to essential systems and personnel performing critical ordnance logistics functions including inventory management, transportation/distribution management, operational/contingency planning, and ordnance safety management critical to operational readiness of Navy, Marine Corps, Coast Guard and SOCOM warfighter units using the Ordnance Information System Wholesale (OIS-W) on the Secure Internet Protocol Routing (SIPR) Network. The Contractor shall deliver and commission a fully operational emergency backup mobile generator system, including all necessary equipment, materials, labor, and services, as specified in this Statement of Work. The Contractor shall also provide training to designated Government personnel on the operation and maintenance of the generator system. Upon delivery and prior to acceptance, the Contractor shall conduct a load bank test to verify the generator s performance. The Contractor shall provide the load bank testing results to the designated Government personnel.
From Sources Sought posted on Aug 08, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA