Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 3 documents

N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE 36C24526Q0118

Solicitation 36C24526Q0118 Copied Notice ID db1c8c50026d464eba2a05b417f0a918 Copied VETERANS AFFAIRS, DEPARTMENT OF — 245-NETWORK CONTRACT OFFICE 5 (36C245)
SAM.gov
Posted
Nov 14, 2025
Deadline
Dec 03, 2025
Set-aside
SBA
NAICS
238220
PSC
N045

Summary

AI-generated · Nov 15, 2025

Remove the existing Weil McClain water-tube boiler (209 MBH) from the Building 6 mechanical room and install a CSD-1 compliant boiler sized to match the existing capacity, on the same equipment pad. Use existing utility lines for tie-ins where possible, but install a new PVC vent line (per NBCI code) and replace the atmospheric metal duct as needed. Confirm the feasibility of utility tie-ins and vent-line replacement during a pre-bid walk-through; some minor space-fitting modifications may be required. Follow the boiler manufacturer install instructions and ensure ICRA safety requirements are met; provide disposal receipts for the old boiler.

Provide all materials, labor, equipment, and supervision, with a warranty and start-up to verify proper operation after installation. Dispose of the existing boiler with receipts submitted to VA. The work must comply with all relevant local, state, federal, and VA specifications and be completed within 30 calendar days from Notice to Proceed.

Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project: 512-25-052 GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation. Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH). Provide disposal receipts to VA. Provide and install CSD-1 compliant Boiler sized to match existing boiler. Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed. Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.

From Combined Synopsis/Solicitation posted on Nov 14, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Nov 14, 2025

Details

Solicitation number 36C24526Q0118
Notice ID db1c8c50026d464eba2a05b417f0a918
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) N045
NAICS 238220
Place of performance Baltimore, Maryland
Archive date Feb 01, 2026

Award Information

Awardees
0

Contacts

primary
William Chris Galletta

Contracting Officer

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
245-NETWORK CONTRACT OFFICE 5 (36C245)

Place of Performance

Department of Veterans Affairs Loch Raven VAMC
FMS 10 N Greene St
Baltimore, Maryland 21201
USA

Dates

Posted Nov 14, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 03, 2025 8 months ago