N--GCFD POWERPLANT UPS (SCADA EACCS) 140R4026R0006
Summary
AI-generated · Jan 16, 2026Identify and procure a UPS and associated components for an existing SCADA system at Glen Canyon Dam, including removing and properly disposing of the current UPS and related equipment in line with environmental and safety regulations, removing unused conduit and conductors, and installing new conduit and conductors where needed. Perform all electrical work, SCADA integration, and testing to restore full operational capability, ensuring compliance with Bureau of Reclamation standards and all applicable codes. The UPS may be solicited as brand-name or equal, with salient characteristics provided in the solicitation, and the contractor will furnish all labor, materials, equipment, and supervision for roughly a one-year project.
Responses should demonstrate capability in UPS installation and SCADA integration, removal and disposal of electrical equipment, and delivery of similar projects, along with bonding capacity and relevant past performance (contracts, values, and points of contact). Submissions are limited to 3 pages and are for market research only (not a solicitation or commitment), with no reimbursement for responses. Provide your information and capability statement to the Contract Specialist per the solicitation instructions.
Sources Sought Notice GCFD Powerplant UPS (SCADA EACCS) Agency: Bureau of Reclamation NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19.0 Million) Estimated Construction Magnitude: FAR 36.204(f) Between $1,000,000 and $5,000,000 Place of Performance: Hwy 89 at Glen Canyon Dam, Page, AZ 86040 Response Due Date: January 28, 2025, at 9:30 a.m. Eastern Description of Requirement The Bureau of Reclamation is conducting market research to identify qualified businesses capable of: Purchasing and installing a new Uninterruptible Power Supply (UPS) and associated components for an existing SCADA system. Removing and properly disposing of the existing UPS and components in compliance with environmental and safety regulations. Removing conduit and conductors that will not be reused. Providing new conduit and conductors where needed. Performing all electrical work, integration, and testing to ensure full operational capability of the SCADA system after installation. Complying with Bureau of Reclamation standards and all applicable federal, state, and local codes. The UPS will be solicited as brand name or equal in accordance with FAR 11.104. Salient characteristics will be provided in the solicitation. Scope Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the project. Anticipated period of performance: approximately 1 year. Submission Requirements Company name, address, point of contact, email, and phone number. Business size and socio-economic status (e.g., Small Business, HUBZone, SDVOSB). UEI number. Capability statement demonstrating experience with: UPS installation and SCADA integration Removal and disposal of electrical equipment Projects of similar size and complexity Bonding capacity (single and aggregate). Relevant past performance (include contract numbers, dollar values, and points of contact). Responses limited to 3 pages, font no smaller than 10 pt (including cover and admin pages). Only the first three pages will be reviewed. Submit responses to Megan Swift, Contract Specialist, at mswift@usbr.gov. Disclaimer This notice is for market research purposes only and does not constitute a solicitation or Government commitment. No reimbursement will be made for costs associated with responding. Requests for hard copies will not be accepted by telephone, mail, or fax. This notice will be available online only at the Contract Opportunities website: https://www.sam.gov.
From Sources Sought posted on Jan 15, 2026Demolish and remove existing SCADA UPS and installation of new SCADA UPS.
From Presolicitation posted on Mar 09, 2026Demolish and remove existing SCADA UPS and installation of new SCADA UPS.
From Solicitation posted on Mar 27, 20261) Fixed Site Visit Time discrepancy 2) Added a Questions and Answers Information Section
From Solicitation posted on Apr 01, 2026Add PPE instruction to site visit.
From Solicitation posted on Apr 03, 2026Publish list of site visit attendees
From Solicitation posted on Apr 16, 2026Extend the due date.
From Solicitation posted on Apr 23, 2026Notice history
7-
Sources Sought Posted Jan 15, 2026
-
Presolicitation Posted Mar 09, 2026View changes (4)
- Title: N--GCFD POWERPLANT UPS (SCADA EACCS) → N--GCFD POWERPLANT UPS (SCADA EACSS)
- Description: Description was updated
- Notice Type: Sources Sought → Presolicitation
- Response Deadline: Jan 28, 2026 → Mar 16, 2026
-
Solicitation Posted Mar 27, 2026View changes (4)
- Title: N--GCFD POWERPLANT UPS (SCADA EACSS) → GC26 SCADA UPS REPLACEMENT
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Mar 16, 2026 → Apr 27, 2026
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Solicitation Posted Apr 01, 2026View changes (2)
- Title: GC26 SCADA UPS REPLACEMENT → N--GC26 SCADA UPS REPLACEMENT
- Description: Description was updated
-
Solicitation LATEST Posted Apr 23, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Apr 27, 2026 → May 18, 2026
Details
Award Information
Not yet awarded