M/V LAWSON W9127825Q0013
Summary
AI-generated · Aug 23, 2025Dry-docking of the M/V LAWSON and performing repairs as detailed in the Technical Specifications. The contractor must furnish all labor, materials, fittings, tools, power, lubricants, fuel, water, electricity, and other necessities to complete the work within the specified period. The LAWSON is a river pushboat built in 2007; approximately 96 feet long, 40 feet beam, around 8 feet 3 inches molded depth amidships, and ~388 long tons displacement.
The contractor must provide the facilities and bear the cost for moving the vessel while in their custody. If removing or shifting parts, fittings, stores, fuel, or water is necessary to carry out the repairs, the contractor will perform these moves and replace any items, making good any damage at their expense. Any alterations to the vessel’s structure, fixtures, or equipment needed to complete the work must be performed at the contractor’s expense. The contractor will also provide space and electricity to moor the Government’s 165-foot-long vessel.
The work required consists of dry-docking the M/V LAWSON and performing the repairs and other work described by these Technical Specifications. The contractor will furnish all labor, material, fittings, tools, power, lubricants, fuel, water, electricity, etc., necessary to accomplish the work within the period specified below.b. The LAWSON is a river pushboat built in 2007 by Quality Shipyards, Houma, LA. General characteristics are:Length - 96?Beam - 40?Molded depth amidships - 8?-3?Displacement - 388 long tonsc. The contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in their possession.d. Should the removal or shifting of any parts of the plant or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at their expense. Should any portion of the plant?s structure, fixtures or equipment require alteration in order to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at their expense.e. The contractor will provide space and electricity for mooring the Government?s 165-foot-long
From Solicitation posted on Jun 06, 2025Notice history
1-
Solicitation LATEST Posted Jun 06, 2025
Details
Award Information
Not yet awarded
Contacts
Phone