Most Holy Trinity Chapel Bell Design and Installation W911SD25RA025
Summary
AI-generated · Aug 24, 2025Design and installation of a bell for Most Holy Trinity Chapel, a small- to mid-scale construction effort with an estimated value in the $25,000 to $100,000 range.
A site visit will be held for prospective bidders. Attendees must check in at the USMA Visitors Control Center to obtain a pass to enter West Point and then proceed to the Mission and Installation Contracting Command West Point office. Allow at least an hour for the VCC processing, and refer to the West Point home page (Visiting Us) for instructions and details.
Project Title: Most Holy Trinity Chapel Bell Design and Installation NAICS Code: 236220 - Commercial and Institutional Building Construction PSC: Y1JZ Size Standard: $45 Million Magnitude of Construction: Between $25,000 and $100,000 SITE VISIT INFORMATION: 18 August 2025 at 1:00 pm EST All personnel attending the site visit will convene at the Mission and Installation Contracting Command West Point s office located on the 1st Floor, 681 Rogers Pl., West Point, NY on 18 August 2025 beginning at 1:00 PM EST. ALL VISITORS MUST PROCEED TO THE USMA VISITORS CONTROL CENTER (VCC) ON SOUTH POST TO GET A PASS TO ENTER WEST POINT. INSTRUCTIONS ARE AVAILABLE ON THE WEST POINT HOME PAGE: www.westpoint.edu AND LOOK FOR THE LINK VISITING US . CALL THE VCC AT Tel: (845) 938-0390 or (845) 938-0392 FOR DETAILS. Give yourself adequate time AT LEAST 1 HOUR PRIOR to go thru the visitors center and then to drive to the MICC West Point office. Depending on the time of day it may go fast and other times it may take up to an hour.
From Solicitation posted on Aug 12, 2025Notice history
1-
Solicitation LATEST Posted Aug 12, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA