Monaco W50S7G25QA002
Summary
AI-generated · Aug 24, 2025Provide all personnel, equipment, tools, materials, supervision, and quality control to perform preventative maintenance on the D-21 Emergency Management system at the 139th Fire Department and at the redundant client site at the 139th Civil Engineering facility, with government-furnished items per Paragraph 3.0 excluded. To support system reliability as the Monaco installation grows, keep staff trained and software up to date; preventative maintenance helps extend equipment life, reduce downtime, protect sensitive electrical components from heat/moisture, and safeguard data. Work is 365 calendar days from award with three option years, at the 139AW Rosecrans Field in St. Joseph, MO, with an adequate, stable workforce maintained at all times; telecommuting is authorized as necessary.
Note: The solicitation was re-uploaded on 16 July 2025 due to PDF issues experienced by potential offerors; no other substantive changes are indicated.
Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide preventative maintenance on the D-21 Emergency Management system both at the 139th Fire Department and redundant client at the the139th Civil Engineering facility, as defined in this PWS. Background: As the installed Monaco system grows in both size and complexity, it is important to keep personnel up to date on training and ensuring all software is updated to the latest releases. In addition, preventative maintenance on the D-21 Emergency Management system can extend the life of the equipment and reduce possible downtime. Sensitive electrical components are easily damaged from excessive heat and moisture; regular maintenance can reduce the chances that these irritants may cause a total system failure. Preventative maintenance saves the government time and money along with safeguarding sensitive data while increasing system performance. Period of Performance (PoP): 365 calendar days (1 year) from the date of contract award with 3 option years. Place and Performance of Services: Performance shall be at the 139AW Rosecrans Field, St. Joseph, MO. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Telecommuting is authorized as necessary.
From Solicitation posted on Jul 15, 2025Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide preventative maintenance on the D-21 Emergency Management system both at the 139th Fire Department and redundant client at the the139th Civil Engineering facility, as defined in this PWS. Background: As the installed Monaco system grows in both size and complexity, it is important to keep personnel up to date on training and ensuring all software is updated to the latest releases. In addition, preventative maintenance on the D-21 Emergency Management system can extend the life of the equipment and reduce possible downtime. Sensitive electrical components are easily damaged from excessive heat and moisture; regular maintenance can reduce the chances that these irritants may cause a total system failure. Preventative maintenance saves the government time and money along with safeguarding sensitive data while increasing system performance. Period of Performance (PoP): 365 calendar days (1 year) from the date of contract award with 3 option years. Place and Performance of Services: Performance shall be at the 139AW Rosecrans Field, St. Joseph, MO. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Telecommuting is authorized as necessary. NOTE: 16July2025 - Solicitation was uploaded again due to PDF issues experienced by potential offerors.
From Solicitation posted on Jul 16, 2025Notice history
2Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA