MODULAR HARDNESS TESTER SPMYM225Q5045
Summary
AI-generated · Sep 28, 2025A Modular Hardness Tester is being procured. If the award requires the contractor to implement NIST SP 800-171, you must have a current assessment per DFARS 252.204-7019 (not older than 3 years unless the solicitation specifies a lesser period); items that are Commercial Off-The-Shelf (COTS) are exempt from this requirement. You must identify and provide this information to the contracting officer with your bid during the solicitation period.
Your quote must include: your contractor information and cage code (POC in Section A); the quoted items and any clarifications (Section B); FOB Destination to Bremerton, WA; in Section B, K21, the Manufacturer’s name, address, and country of manufacturing; Section F with lead time or delivery date; Section K to indicate applicability of 52.204-24 (d)(1) and (2) and 52.209-11 (b)(1) and (2); page 1 box 28 and the signatures for boxes 30a, 30b, and 30c. Return a signed and completed solicitation with your quote by the stated deadline, submitted via email.
To be considered for award, if the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 (I.E., not more than 3 years old unless a lesser time is specified in the solicitation) **Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period** Please read the contract in its entirety. If you are able to provide a quote be sure to provide the following information in the sections provided below: Page 1 BLK 17a. Provide Contractor's info and cage code. Section A. A1 1. Enter The Contractor's POC Section B. Enter your Quote and any other info we should know. Please quote FOB Destination BREMERTON, WA. Section B. K21 Check the appropriate box and provide the Manufacturer s Name, Address and the Country of Manufacturing Section F. Provide the Lead Time and/or Delivery Date. Section K. - 52.204-24 (d)(1) and (2) Check the applicable boxes Section K. - 52.209-11 (b)(1) and (2) Check the applicable boxes Page 1 - Read box 28 and sign boxes 30 a, b, and c. Return the signed and filled out solicitation with your quote by SUNDAY, 28 SEPTEMBER 2025 7AM FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL. EMAIL: roserenee.oreszko@dla.mil
From Solicitation posted on Sep 26, 2025Notice history
1-
Solicitation LATEST Posted Sep 26, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA