Contacts, documents and full notice history are available with a subscription.
Special Notice NONE Expired 1 notice

Modular Cryogenic Liquid Nitrogen Production System – OEM Equipment Manufacturer Inquiry 80SSC025K0001

Solicitation 80SSC025K0001 Copied Notice ID 7bc06f1c30f846ba9c8cef309aeb531f Copied NATIONAL AERONAUTICS AND SPACE ADMINISTRATION — NASA STENNIS SPACE CENTER
SAM.gov
Posted
Sep 15, 2025
Deadline
Sep 26, 2025
Set-aside
NONE
NAICS
325120
PSC
3655

Summary

AI-generated · Sep 17, 2025

OEMs capable of supplying a commercial off-the-shelf, modular, skid-mounted cryogenic air separation unit (ASU) to produce high-purity liquid nitrogen are being sought. The system may be provided as equipment only or as a turnkey package including design, fabrication, delivery, installation, commissioning, and operator training. It must route liquid nitrogen directly into on-site storage, be compatible with standard transfer connections, and integrate with existing infrastructure. Two capacities are under consideration: approximately 75 and 100 tons per day with 20–25% turndown. The technology must be cryogenic air separation (no membrane or PSA), fully automated with remote/local/unattended control, and arranged as modular skid-mounted train units with prefabricated skids and interconnections, within a maximum footprint of 180 ft by 50 ft, including all required electrical and cooling equipment. A liquid nitrogen transfer system must tie into the on-site LN2 storage tanks (up to 50 ft tie‑in).

This notice requests detailed information to inform future procurement. The turnkey option should cover complete system design, fabrication, factory testing, delivery, installation, commissioning, and operator training/documentation, with advanced instrumentation and an intuitive HMI/SCADA interface, designed for ease of installation, operation, relocation, cost efficiency, low maintenance, and energy savings. Respondents should provide company profile and capabilities (including US presence and the country of manufacture for major components), system specifications and layouts, utility needs, lead times, maintenance options, and references. Include ROM pricing for equipment alone (75 TPD and 100 TPD) and for turnkey systems, broken down by major components, along with tariff- and non-tariff pricing, and notes on any components sourced from tariffed countries. NASA stresses this is market research for potential future procurement; any resulting solicitation would not be a BOO arrangement, NASA would own and operate the system, and the scope is tied to replacing existing LN supply beginning in FY26, with OEMs typically supplying the cooling water system if required.

Request for Information 1. Purpose This Request for Information (RFI) is issued to identify qualified original equipment manufacturers (OEMs) capable of supplying a commercial off-the-shelf (COTS), modular, skid-mounted cryogenic air separation unit (ASU) for the production of high-purity liquid nitrogen. The Government is seeking equipment manufacturers only not general contractors or engineering firms who can provide the equipment only or equipment with a complete turnkey solution including surrounding infrastructure design, fabrication, delivery, installation, and commissioning of the system. The produced liquid nitrogen will be routed directly into existing on-site liquid nitrogen storage tanks. The system must be compatible with standard industry transfer connections and designed to integrate seamlessly with existing infrastructure. Location: Building 3305, High Pressure Gas Facility, Stennis Space Center, MS 39529 2. System Requirements The proposed system must meet the following minimum technical and operational requirements: 2.1 Production Capacity (2 separate systems being considered) Approximately 75 & 100 tons per day (TPD) of liquid nitrogen with (20-25%) turndown capability. Grade B Liquid Nitrogen (Reference MIL-PRF-27401) 2.2 Technology Cryogenic air separation process only (no membrane or PSA systems) Fully automated operation with remote/local/unattended control capabilities 2.3 Design & Footprint Modular, skid-mounted, train-style configuration Highly prefabricated skids with interconnecting piping and wiring Maximum total footprint: 180 ft x 50 ft Includes all electrical and cooling equipment (if required) 2.4 Turnkey Scope OEM must provide: Complete system design Fabrication and factory testing Delivery and installation Commissioning and activation Operator training and documentation 2.5 Operational Features State-of-the-art analytical instrumentation User-friendly HMI/SCADA interface Designed for ease of installation, operation, and relocation Emphasis on cost efficiency, low maintenance, and energy savings Must include liquid nitrogen transfer system compatible with existing LN? storage tanks (the plant will be up to 50ft to tie-in point) 3. Requested Information Interested OEMs are requested to submit the following: Company profile, UEI, business size, and relevant experience with cryogenic ASUs Technical specifications of the proposed system System layout drawings or conceptual diagrams Utility requirements (power, water, etc.) Estimated lead time for: Procurement/fabrication Delivery Installation and commissioning Maintenance and support offerings References or case studies of similar systems delivered Manufacturing and U.S. Presence Please include: Country of manufacture for major system components U.S.-based presence (e.g., offices, service teams, fabrication facilities) Availability of U.S.-based technical support and field service personnel Pricing Information Please provide the following pricing details: Rough Order of Magnitude (ROM) pricing for equipment only (75 & 100 TPD systems each) Rough Order of Magnitude (ROM) pricing for each complete turnkey system Breakdown of pricing by major components (e.g., ASU, instrumentation, skids, installation, etc.) Tariff-impacted pricing: Include any applicable import duties or tariffs Non-tariff pricing: Provide pricing assuming no tariffs or duties apply Notes on tariff origin: Identify any components or subsystems sourced from countries subject to U.S. import tariffs Additional RFI information The market research information gathered from this RFI will be used to develop and plan any potential future procurement. Based upon information submitted in response to this RFI, NASA will determine the final content of any future solicitation(s). A determination by the Government not to procure this requirement, based upon responses to this notice, is solely within the discretion of the Government. Although all comments received will be carefully reviewed and considered for inclusion in any possible later action, the initiators of this request make no commitment to include any recommendations. Respondents will NOT be notified of the results of the analysis of submissions received. This notice should not be construed as a formal Request for Quotation (RFQ) or Proposal (RFP) (solicitation). Responses to this RFI are not offers and cannot be accepted by NASA to form a binding contract. This notice is not to be construed as a commitment by the Government to make a purchase, nor will the Government pay for the information solicited or be held liable for any information obtained. Submission of any information in response to this notice is completely voluntary. Responses should be based on the material contained in this notice and any other relevant information the contractor thinks appropriate. Comments or suggestions relevant to this requirement are welcome and may also be included in the response. Contractors are welcome to submit any additional documentation that may support their ability to comply with the Government s requirement. No solicitation exists; therefore, do not request a copy of the solicitation. If an ombudsman is needed, contact Melissa Wagner at melissa.r.wagner@nasa.gov. Acronym Definition ASU Air Separation Unit BOM Bill of Materials COTS Commercial Off-The-Shelf DCS Distributed Control System DOE Department of Energy EPC Engineering, Procurement, and Construction FAT Factory Acceptance Testing HMI Human-Machine Interface HPGF High Pressure Gas Facility HVAC Heating, Ventilation, and Air Conditioning LN? Liquid Nitrogen MIL-PRF Military Performance Specification NASA National Aeronautics and Space Administration NFPA National Fire Protection Association NFPA 70E Standard for Electrical Safety in the Workplace OEM Original Equipment Manufacturer O&M Operations and Maintenance PLC Programmable Logic Controller PSA Pressure Swing Adsorption PSSR Pre-Startup Safety Review QA/QC Quality Assurance / Quality Control ROM Rough Order of Magnitude RFI Request for Information SCADA Supervisory Control and Data Acquisition SSC John C. Stennis Space Center TPD Tons Per Day UEI Unique Entity ID UPS Uninterruptible Power Supply USA United States of America Responses to Questions: Will NASA consider an onsite supply agreement for LIN on a BOO basis? The RFI appears to be structured more as an equipment purchase. NASA Response: NASA will not consider an agreement for LIN on a BOO Bases. We plan to procure, own, and operate the system. When is the LIN demand from the RFI scope expected to begin? NASA Response: This is replacement of current LIN demand. The scope is expected to begin in FY26 depending on available funding and RFI responses. Is this a new LIN demand, or is the scope intended as a cost-savings initiative to replace existing transported LIN supply? NASA Response: This is not a new LIN demand, a scope intended as a cost savings initiative to replace existing transported LIN supply. This scope is intended to supply the current LIN Tanks/System. What is the required LIN pressure at the battery limit? NASA Response: Our current LIN storage tanks stay under 5 psi. The liquid nitrogen is pumped/vaporized up to 6000 PSI, but usually stays between 3000 4000 PSI. Should contractors assume that NASA will provide the necessary cooling water for the system, or should we plan to include our own cooling system? NASA Response: The OEM will supply the cooling water system if required.

From Special Notice posted on Sep 15, 2025

Notice history

1
  1. Special Notice LATEST Posted Sep 15, 2025

Details

Solicitation number 80SSC025K0001
Notice ID 7bc06f1c30f846ba9c8cef309aeb531f
Notice type Special Notice
Product / Service (PSC) 3655
NAICS 325120
Set-aside No Set aside used
Place of performance Stennis Space Center, Mississippi
Archive date Oct 11, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Justin Lucas

Email

Phone

secondary
Melissa Wagner

Email

Phone

Agency

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NASA STENNIS SPACE CENTER

Place of Performance

Stennis Space Center, Mississippi 39529
USA

Dates

Posted Sep 15, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 26, 2025 10 months ago