Modification-Construction Services for the relocation of U.S. Embassy’s Chancery-Annex Connectivity Line located at Natun Bazar Metro Station Construction Site MOD_RFQPR15426539

Solicitation MOD_RFQPR15426539 Copied Notice ID c418535ca5084ca1adac01fdc54ea540 Copied STATE, DEPARTMENT OF — US EMBASSY DHAKA
SAM.gov
Posted
Aug 26, 2025
Deadline
Aug 28, 2025
Set-aside
NONE
NAICS
2371
PSC
3895

Summary

AI-generated · Aug 27, 2025

Relocate the U.S. Embassy Dhaka Chancery-Annex connectivity line at the Natun Bazar Metro Station construction site. The work involves installing four 4-inch metal conduits inside a 12-inch-diameter protective mild steel pipe along the length, removing and redoing pavement where needed, and constructing pits and other required concrete works, all per the provided specifications and drawings.

The contractor must supply all materials (conduit pipe, protective steel pipe, reinforcing bars, cement, sand, aggregates, paving tiles) and provide labor, tools, and equipment, and perform all operations to complete the project, including removing, demolishing, and dismantling existing works at the site. All work is to proceed after a prior joint review and concurrence by the Government and the Contractor.

U S Embassy Dhaka requires a contractor to relocate Chancery-Annex connectivity line consisting of four 4-inch diameter metal conduits at Natun Bazar Metro Station construction site. Work of this contract is comprised of placing four 4-inch diameter metal conduit in a 12-inch diameter protective mild steel pipe surrounding the conduits throughout the length of the connectivity, removing the existing pavement works, and redoing the same where necessary at Natun Bazar Metro Station construction site, Baridhara, as per specifications and drawings provided, including construction of pit and other necessary concrete works. The scope of the work is described in the specifications. All materials, metal conduit pipe, protective mild steel pipe, reinforcing bar, cement, sand, stone chips, paving tiles, labor, tools and equipment shall be provided by the contractor, except otherwise mentioned in SOW and shall also perform operations necessary to complete the work as well as removing, demolishing, dismantling existing works on proposed site. All the above requirements will be based on prior joint review and concurrence by the Government and the Contractor.

From Solicitation posted on Aug 26, 2025

Notice history

1
  1. Solicitation LATEST Posted Aug 26, 2025

Details

Solicitation number MOD_RFQPR15426539
Notice ID c418535ca5084ca1adac01fdc54ea540
Notice type Solicitation
Product / Service (PSC) 3895
NAICS 2371
Set-aside No Set aside used
Place of performance Dhaka, Dhaka
Archive date Aug 29, 2025

Award Information

Not yet awarded

Contacts

primary
MD ROFIQUL ISLAM

Email

Phone

secondary
Robin L. Jones

Email

Phone

Agency

STATE, DEPARTMENT OF
STATE, DEPARTMENT OF
US EMBASSY DHAKA

Place of Performance

Dhaka, Dhaka 1212
BGD

Dates

Posted Aug 26, 2025 11 months ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 28, 2025 11 months ago