Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus W912PL25BA008
Summary
AI-generated · Aug 24, 2025Construct a new combined pumphouse and substation at the Long Beach VA Campus and demolish the existing building 125 pumphouse and substation 12A. The existing pumphouse will remain operational in its current location during construction, with temporary power provided to the Fisher House on-campus hotel while work proceeds in phases to allow continuous operation of the existing facility. The project includes preparation and performance of submittals, field investigations, site visits, and construction meetings with minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures, and other related services. Based on the VA Long Beach Campus history, asbestos is likely in the existing pumphouse, so the contract will address potential asbestos handling under U.S. Army Corps of Engineers Safety and Health Requirements.
Changes across notices include: pre-bid site visit sign-in information being provided, SF-30 amendments transmitted for the IFB, and a shift to PIEE for bid submissions (no DoD Safe submissions). The bid opening date has been extended per amendments, and a Bid Abstract has been posted. Administrative updates indicate that future amendments will also be accompanied by an SF-30.
PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the RFP W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements.The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.
From Solicitation posted on Jun 25, 2025PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA008. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.
From Solicitation posted on Jul 02, 2025PIEE Update 0003 is issued to transmit the SF-30 (7 pages) for Amendment 0002 of the IFB W912PL25BA008. This is to extend the bid opening date and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA008. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.
From Solicitation posted on Jul 18, 2025Be advised that the Bid Abstract has been posted and is available to download on 7.22.2025 at 1600. PIEE update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. PIEE Update 0003 is issued to transmit the SF-30 (7 pages) for Amendment 0002 of the IFB W912PL25BA008. This is to extend the bid opening date and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA008. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.
From Solicitation posted on Jul 22, 2025Notice history
4-
Solicitation Posted Jun 25, 2025
-
Solicitation Posted Jul 18, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 21, 2025 → Jul 22, 2025
Details
Award Information
Not yet awarded