Mobile Emergency Response Support (MERS) Thomasville HVAC Replacement 70FBR425Q00000160
Summary
AI-generated · Aug 26, 2025Replace the existing closed-loop WSHP HVAC in the Vehicle and Administration Building with a new non-closed-loop water-source system. The 47,000 sq ft facility will be served by a 3-phase, 460V system totaling 70 tons across 15 units. Contractor to supply all labor, materials, parts, tools, and services to remove the old equipment and install the new system, including a pre-work condition assessment, ceiling-structure repairs to current standards if needed, and post-install testing. Reclaim refrigerant from the existing system and reuse any usable refrigerant in the new installation; inspect all fittings and lines and coordinate with the COR if any are unusable; repair any damages caused during removal/installation at the contractor’s expense.
A site visit is strongly recommended to better understand scope and site conditions, with attendance limited to two representatives per company and coordinated through designated contacts. All questions must be submitted in writing by the stated deadlines, and quotations must be submitted by the stated deadline to the designated submission recipients. Technical Exhibits 1 and 2 must be reviewed as part of the requirements.
********** Please Read Over All Attached Documentation In Their Entirety ********** Purpose: The Mobile Emergency Response Support Thomasville (MERS-TV) has a need to remove the existing closed loop, water source heat pump system (WSHP) Heating, Ventilation, Air-Conditioning (HVAC) system and install all a new Heating, Ventilation, Air-Conditioning (HVAC) system in the Vehicle and Administration Building (VSAB). The replacement HVAC System will not be a closed loop water source heat pump system (WSHP). System specs: (10,000 view) 3-phase/460V water source HVAC system consisting of 15 individual units totaling 70 tons providing climate control to a multi-use 47,000 sq ft building. Scope of Work: Mobile Emergency Response Support Thomasville (MERS-TV) has a need to replace the existing HVAC system and install new in the VSAB. Contractor will furnish all labor, material, Parts, HVAC, tools, and services necessary, along with incidental to complete the removal of existing and install new. o Prior to commencing VSAB HVAC Repair Project, contractor shall thoroughly inspect conditions of all areas of associated with project to ensure proper installation can be completed. Submit findings in document form to government for review. If/any issues with ceiling structure shall be repaired or modified to satisfy current industry standards before placement of any new HVAC components. o Contractor shall remove existing HVAC Equipment and return it to the government, in accordance with the Contract. o Contractor shall replace HVAC equipment with new, non-closed loop, water source heat pump system. o Contractor shall inspect all fittings, lines before installing new equipment. If lines, fittings are found to be unusable, contractor will contact the COR. o Contractor shall reclaim all refrigerant from existing HVAC equipment before removal. Contractor will reuse the usable reclaimed refrigerant when installing new HVAC equipment. o Contractor shall replace at there own expense any damages that occur while removing and/or installing equipment. (Example: ceiling tile, ceiling grid, wall plaster, concrete etc). o Contractor shall test after installation of new HVAC System to make sure everything is set up and working the way it should. o Contractor shall review TECHNICAL EXHIBIT 1, on pg 15 of it's entirely. o Contractor shall review TECHNICAL EXHIBIT 2, on pg 17 of it's entirely. A Site visit is strongly recommended. A site visit will help vendors to submit more accurate, competitive, and tailored bid, increasing their chances of being considered for the requirement and reducing risk. The facility is a 40-year-old, purpose-built multi-use building. Visiting the site will allow for: Better understanding of the scope, assess the actual site conditions, see potential challenges, opportunity to ask clarifying questions A Site Visit will be held Monday July 14, 2025 between the hours of 8:00am to 4:00pm. Please email tiffany.young@fema.dhs.gov and kimberly.coakley@fema.dhs.gov to sign up for a site visit time. Limit of 2 visitors per Company. The cut-off date to make a site visit reservation will be Thursday July 10, 2025 by 12:00pm ET. All Questions shall be made in writing to tiffany.young@fema.dhs.gov and kimberly.coakley@fema.dhs.gov. The cut-off day for questions will be Tuesday, July 15, 2025 by 12:00pm ET. Responses to questions will be returned as soon as practicable. All Quotes are due no later than 12:00pm ET Friday July 18, 2025, to the following email addresses: tiffany.young@fema.dhs.gov and kimberly.coakley@fema.dhs.gov.
From Solicitation posted on Jul 07, 2025Notice history
1-
Solicitation LATEST Posted Jul 07, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
n/a
Phone
Agency
Place of Performance
USA