Mini-Mezzanine Storage Cabinet System FA521525Q0038
Summary
AI-generated · Sep 19, 2025Procure and install one mezzanine cabinet system for the 15 MXS Propulsion Flight to securely store specialty tools, tool kits, engine test equipment, DIFM parts, and hazardous materials. Required features include stackable cabinets and drawers with mezzanine access and walkways, locking doors and drawers to meet security requirements, an elevated walkway platform with stairs and railing access, and a configuration that maximizes available space. See the attached Mini-Mezzanine Storage Cabinet System Summary Description for detailed specifications.
Across the three records, the requirement is identical; no changes or new information are noted between notices.
The 15 MXS Propulsion Flight requires the procurement and installation of one (1) mezzanine cabinet system to provide secure storage for specialty tools, tool kits, engine test equipment, Due-In-For-Maintenance (DIFM) parts, and hazardous materials. System features must include: Stackable cabinets/drawers with mezzanine access and walkways Locking doors/drawers to meet security requirements Elevated walkway platform with stair and railing access Configurable to maximize available space. Please see Mini-Mezzanine Storage Cabinet System Summary Description attached for specifications
From Combined Synopsis/Solicitation posted on Sep 15, 2025The 15 MXS Propulsion Flight requires the procurement and installation of one (1) mezzanine cabinet system to provide secure storage for specialty tools, tool kits, engine test equipment, Due-In-For-Maintenance (DIFM) parts, and hazardous materials. System features must include: Stackable cabinets/drawers with mezzanine access and walkways Locking doors/drawers to meet security requirements Elevated walkway platform with stair and railing access Configurable to maximize available space. Please see Mini-Mezzanine Storage Cabinet System Summary Description attached for specifications
From Combined Synopsis/Solicitation posted on Sep 16, 2025The 15 MXS Propulsion Flight requires the procurement and installation of one (1) mezzanine cabinet system to provide secure storage for specialty tools, tool kits, engine test equipment, Due-In-For-Maintenance (DIFM) parts, and hazardous materials. System features must include: Stackable cabinets/drawers with mezzanine access and walkways Locking doors/drawers to meet security requirements Elevated walkway platform with stair and railing access Configurable to maximize available space. Please see Mini-Mezzanine Storage Cabinet System Summary Description attached for specifications
From Combined Synopsis/Solicitation posted on Sep 18, 2025The 15 MXS Propulsion Flight requires the procurement and installation of one (1) mezzanine cabinet system to provide secure storage for specialty tools, tool kits, engine test equipment, Due-In-For-Maintenance (DIFM) parts, and hazardous materials. System features must include: Stackable cabinets/drawers with mezzanine access and walkways Locking doors/drawers to meet security requirements Elevated walkway platform with stair and railing access Configurable to maximize available space. Please see Mini-Mezzanine Storage Cabinet System Summary Description attached for specifications
From Combined Synopsis/Solicitation posted on Sep 22, 2025The 15 MXS Propulsion Flight requires the procurement and installation of one (1) mezzanine cabinet system to provide secure storage for specialty tools, tool kits, engine test equipment, Due-In-For-Maintenance (DIFM) parts, and hazardous materials. System features must include: Stackable cabinets/drawers with mezzanine access and walkways Locking doors/drawers to meet security requirements Elevated walkway platform with stair and railing access Configurable to maximize available space. Please see Mini-Mezzanine Storage Cabinet System Summary Description attached for specifications
From Combined Synopsis/Solicitation posted on Sep 23, 2025Notice history
5-
Combined Synopsis/Solicitation Posted Sep 15, 2025
-
Combined Synopsis/Solicitation Posted Sep 16, 2025View changes (1)
- Response Deadline: Sep 22, 2025 → Sep 25, 2025
-
Combined Synopsis/Solicitation Posted Sep 18, 2025No changes from previous notice
-
Combined Synopsis/Solicitation Posted Sep 22, 2025View changes (1)
- Response Deadline: Sep 25, 2025 → Sep 26, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 23, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA