MIL-DTL-60508B, Initiator, Cartridge Actuated Delay, M6A1, M26, M33, M44, Metal Parts Assembly N0002425SN-44
Summary
AI-generated · Aug 24, 2025Draft MIL-DTL-60508B, Initiator, Cartridge Actuated Delay, M6A1, M26, M33, M44, Metal Parts Assembly, is being developed to establish standards that accommodate a variety of design solutions and manufacturing processes for the metal parts assembly of these initiators, with the goal of encouraging a broad supplier base.
Copies of the draft can be requested by referencing the document number in a request to NAVSEA Command Standards; the review period ends, and the final document will be posted on ASSIST Online when completed. This is not a solicitation.
The Naval Sea Systems Command (NAVSEA) intends to draft specifications and standards to accommodate a variety of design solutions and processes, and to encourage a broad vendor base. NAVSEA is preparing draft MIL-DTL-60508B, Initiator, Cartridge Actuated Delay, M6A1, M26, M33, M44, Metal Parts Assembly. Copies of this document may be requested by sending an email to CommandStandards@navy.mil with the document number in the subject line and a brief message requesting a copy of the document. Please note that the review period ends 09/12/25. Those interested can check ASSIST Online at https://quicksearch.dla.mil/ for the final document when it has been completed. THIS IS NOT A SOLICITATION.
From Special Notice posted on Aug 13, 2025Notice history
1-
Special Notice LATEST Posted Aug 13, 2025
Details
Award Information
Not yet awarded