Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building) MrktSrvy-IWTPUpgrade-MMAC
Summary
AI-generated · Jun 02, 2026Upgrade of an Industrial Wastewater Treatment Plant by demolishing the existing IWTP and constructing a new single-story PEMB (approximately 4,900 gross SF) north of the current facility, including new lift stations and forcemain piping. The scope covers replacing Lift Stations 1, 3, and 4 with new double-walled fiberglass wet wells for full secondary containment; demolishing and filling Lift Stations 2 and 5; removing the existing concrete containment trench; installing new double-walled CPVC piping (4-inch inner, 6-inch outer) via direct burial along the former trench path; and decommissioning the old IWTP once flow is diverted to the new plant.
This is a market survey to assess vendor capability for a project estimated between $10 million and $20 million. Respondents should submit a capability statement detailing the firm’s services, prior government/private contracts, years in business, small business size status and socio-economic status, SAM/UEI status, and examples of past projects of similar magnitude (including client, rough dollar value, and scope). Responses are due by a stated deadline and should be sent to the designated FAA contact.
*********************THIS IS A MARKET SURVEY ONLY******************** - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor s expense. ****************************************************************************** 1. This market survey is for Industrial Wastewater Treatment Plant (IWTP) which include demo existing building and construct a new Pre-Engineered Metal Building (PEMB) as identified below. b. Disclosure of the Size of Construction Projects: This potential project is estimated to be between $10,000,000 and $20,000,000 a. Provide all labor, equipment, and materials to demolish existing Industrial Wastewater Treatment Plant (IWTP) and associated equipment. Replace with a new building located north of the existing plant as well as new lift stations and forcemain piping. The project includes: A new single story, Pre-Engineered Metal Building (PEMB) approximately 4,900 Gross Square Feet. Primary space is an industrial waste treatment processing area, with accessory office/work areas, equalization tank/area, storm shelter restroom, and utility support spaces. The existing IWTP plant (eIWTP) will be decommissioned and demolished once the new IWTP (nIWTP) plant has been built and flow has been diverted to the nIWTP for processing. Lift Stations #1, 3, and 4 will be replaced with new double-walled fiberglass wet wells to ensure full secondary containment. Lift stations #2 and #5 will be demolished and filled in with select fill and covered with sod. The existing concrete containment trench that houses the industrial waste force mains from the lift stations to the eIWTP will be demolished in full and removed. New 4-inch inner diameter by 6-inch outer diameter double-walled CPVC piping will be installed via direct bury, along the path of the removed trench. 2. Market Survey Response should include the following: a. Capability Statement - This document should identify: - Type of services provided by firm, - Size and type of services provided on previous government/private sector contracts - Number of years in business - Small Business Size Status to include applicable small business socio-economic status - Current SAM.gov Registration status and SAM.gov UEI b. Brief information (Agency or Customer/Dollar Amount/Scope/etc) regarding past projects respondent has completed with similar magnitude and work that is identified in this Market Survey All responses to this market survey must be received by June 22, 2026, 3:00 p.m. CT. All capability statements must be submitted by email to: andre.casiano@faa.gov
From Sources Sought posted on Jun 01, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance