Microwave Multimode (MWM) Continuous Paving, Horizontal, and Vertical Construction Techniques 25-59-PS50_MWM-JOFOC
Summary
AI-generated · Feb 11, 2026Justification for Other Than Full and Open Competition (JOFOC) supporting the award of Microwave Multimode (MWM) Continuous Paving, Horizontal, and Vertical Construction Techniques under modification P00004 is provided; a copy of the JOFOC is attached.
This notice, posted in accordance with FAR 5.302, explains why the procurement is being conducted as a noncompetitive award rather than through full and open competition, and directs reviewers to the attached JOFOC for the detailed justification.
This post provides the Justification for Other Than Full and Open Competition (JOFOC) supporting the award of the Microwave Multimode (MWM) Continuous Paving, Horizontal, and Vertical Construction Techniques contract 80MSFC24CA009 modification P00004. This notice is being posted as required by FAR 5.302. A copy of the JOFOC is attached to this notice.
From Justification posted on Feb 10, 2026Notice history