Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 3 notices 3 documents

MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI) 70Z03826IB0000024

Solicitation 70Z03826IB0000024 Copied Notice ID 2a24a13e3f784220a37e59dc71cd71bb Copied HOMELAND SECURITY, DEPARTMENT OF — AVIATION LOGISTICS CENTER (ALC)(00038)
SAM.gov
Posted
Dec 03, 2025
Deadline
Dec 19, 2025
Set-aside
None
NAICS
336413
PSC
N/A

Summary

AI-generated · Dec 04, 2025

The Coast Guard is seeking information from industry on an Environmental Control System (ECS) to replace the MH-65 helicopter’s current vapor-cycle cooling system with a lighter-weight solution that delivers greater cooling capacity. The RFI invites input on candidate cooling technologies (including vapor cycle, bleed air, and electric or mechanically driven options) and potential suppliers for consideration, with the system including spare parts and support and designed to minimize government inventory.

Key requirements include open architecture using standard government and commercial protocols, with full documentation such as interface control documentation and maintenance data; the system must fit into the current ECS compartments and support a universal refrigerant servicing interface. Vendors must be OEMs for aircraft ECS, FAA certified, with an STC for ECS on other aircraft and experience with airworthiness authorities; there must be a permanent US presence with English-speaking technical support, and the contractor should provide an on-site engineer during development, integration, and testing phases. If multiple qualified vendors are identified, a subsequent RFP will evaluate technical fit, schedule, and price to determine best value.

Request for Information (RFI): This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned. The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration. Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven. Please respond to the following questions in addition to submission of your company s capability statement: Is your business a large or small business? If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business? If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act? Is your firm a certified "hub zone" firm? Is your firm a woman-owned or operated business? Is your firm a certified Service-Disabled Veteran-Owned? Is your product listed on a GSA schedule? Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers? If possible, any POC's for civilian users for general usage of product questions. Additional Project Details and Objectives 1.0 Scope The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements. 2.0 Background The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2? CG engines. The aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements. The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin. The MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant. The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades. 3.0 Support A Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process. 3.1 Open Architecture The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction. A full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance. Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use. 3.2 Integration Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases. 4. Vendor Qualification The supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support. The supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation. The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format. 5. Evaluation After evaluation of the information received, the Coast Guard may issue a separate request for proposals. It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well. If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government. Enclosures: *See attachments 1, 2, & 3* H-65 Environmental Control System (ECS), Performance Objectives H-65 Data ECS Compartment CAD model Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.

From Sources Sought posted on Dec 03, 2025

Amendment 01- Vendor question with answer. See below: QUESTION #1: I have a question for this RFI. Notice ID 70Z03826IB0000024. MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI) It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter? ANSWER #1: The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter. ______________________________________________________________________ Request for Information (RFI): This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned. The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration. Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven. Please respond to the following questions in addition to submission of your company s capability statement: Is your business a large or small business? If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business? If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act? Is your firm a certified "hub zone" firm? Is your firm a woman-owned or operated business? Is your firm a certified Service-Disabled Veteran-Owned? Is your product listed on a GSA schedule? Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers? If possible, any POC's for civilian users for general usage of product questions. Additional Project Details and Objectives 1.0 Scope The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements. 2.0 Background The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2? CG engines. The aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements. The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin. The MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant. The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades. 3.0 Support A Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process. 3.1 Open Architecture The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction. A full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance. Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use. 3.2 Integration Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases. 4. Vendor Qualification The supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support. The supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation. The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format. 5. Evaluation After evaluation of the information received, the Coast Guard may issue a separate request for proposals. It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well. If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government. Enclosures: *See attachments 1, 2, & 3* H-65 Environmental Control System (ECS), Performance Objectives H-65 Data ECS Compartment CAD model Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.

From Sources Sought posted on Dec 15, 2025

Amendment 02- Vendor question with answer. See below: Question #2: Thank you for this information. We have one more question for you. From context, in the description, it states This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration. We are an engineering firm that designs first-of-a-kind systems. Are you considering engineering a new ECS system, OR are you asking industry what is currently available that you can use as a replacement? Answer #2: The USCG is asking industry what is currently available, with minor changes, that we can use as a replacement. Amendment 01- Vendor question with answer. See below: QUESTION #1: I have a question for this RFI. Notice ID 70Z03826IB0000024. MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI) It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter? ANSWER #1: The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter. ______________________________________________________________________ Request for Information (RFI): This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned. The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration. Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven. Please respond to the following questions in addition to submission of your company s capability statement: Is your business a large or small business? If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business? If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act? Is your firm a certified "hub zone" firm? Is your firm a woman-owned or operated business? Is your firm a certified Service-Disabled Veteran-Owned? Is your product listed on a GSA schedule? Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers? If possible, any POC's for civilian users for general usage of product questions. Additional Project Details and Objectives 1.0 Scope The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements. 2.0 Background The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2? CG engines. The aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements. The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin. The MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant. The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades. 3.0 Support A Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process. 3.1 Open Architecture The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction. A full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance. Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use. 3.2 Integration Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases. 4. Vendor Qualification The supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support. The supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation. The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format. 5. Evaluation After evaluation of the information received, the Coast Guard may issue a separate request for proposals. It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well. If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government. Enclosures: *See attachments 1, 2, & 3* H-65 Environmental Control System (ECS), Performance Objectives H-65 Data ECS Compartment CAD model Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.

From Sources Sought posted on Dec 17, 2025

Notice history

3
  1. Sources Sought Posted Dec 03, 2025
  2. Sources Sought Posted Dec 15, 2025
    • Description: Description was updated
  3. Sources Sought LATEST Posted Dec 17, 2025
    • Description: Description was updated

Details

Solicitation number 70Z03826IB0000024
Notice ID 2a24a13e3f784220a37e59dc71cd71bb
Notice type Sources Sought
NAICS 336413
Archive date Jan 19, 2026

Award Information

Not yet awarded

Contacts

primary
Mary Elaina Price

Email

Phone

secondary
Alyson Harrison

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
AVIATION LOGISTICS CENTER (ALC)(00038)

Dates

Posted Dec 03, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 19, 2025 7 months ago