M/D Totko Tension Load Cell Assemblies W912ES26QA020
Summary
AI-generated · Dec 24, 2025Eighteen M/D Totco tension load cell assemblies are being procured for Load Moment Indicators on the Westmont bulkhead hoists, using part number 11033725-001 (legacy TC-55K-E6110-01). These are OEM components for ten bulkhead hoists installed in the 1980s, with a 55,000 lb capacity and constructed from 17-4 stainless steel, single-bridge configuration, and will be wrapped in anti-static protective packaging and boxed individually.
The supplier must include standard documentation, an Operator and Maintenance manual, and a Certificate of Conformance prior to shipment. Deliveries are FOB Destination to the Mississippi River Project Office in Fountain City, WI, with delivery accepted during Monday–Friday, 07:00–15:00; no weekend or holiday deliveries. The contractor bears all packaging, shipping, and handling costs. Quantity is 18 units.
1. GENERAL DESCRIPTIONThe Operations Section of the US Army Corps of Engineers, St Paul District is solicitating the procurement of eighteen (18) new tension load cell assemblies for the LMI (Load Moment Indicators) on our Westmont bulkhead hoists. This is specifically for the M/D TOTCO 11033725-001 part (replaces TC-55K-E6110-01) which is an OEM component to our ten dam bulkhead hoists installed in the 1980?s. Delivery is NLT September 1, 2026 2. SPECIFICATIONS:A. M/D Totco Tension Load Cell Assembly: ? Part # 11033725-001 ? Legacy Part # TC-55K-E6110-01? Quantity: eighteen (18) total? 55,000 lb capacity? 17-4 SST material? Single-bridge? Wrapped in anti-static protective packaging. Bubble-wrap and boxed individually.? MV/V? Include standard documentation and Operator and Maintenance manual.? Include Certificate of Conformance prior to shipment3. DELIVERY SCHEDULE/LOCATION:All components must be delivered FOB to Mississippi River Project Office (MRPO) in Fountain City, WI on or before September 1, 2026. Delivery hours are Monday thru Friday 07:00 ? 15:00. No deliveries will be accepted on weekends or federal holidays.The quoted price shall be FOB: Destination, with the Contractor responsible for all packaging, shipping and handling costs.
From Solicitation posted on Dec 23, 2025Notice history
1-
Solicitation LATEST Posted Dec 23, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
54629