Mather Fueling System Repairs W9128F26RA070
Summary
AI-generated · Dec 19, 2025Modify a 12,000-gallon jet fuel (F-24) horizontal aboveground storage tank and surrounding fueling area. Work includes adding a sampling/gauging hatch to a tank manway and a clock-type mechanical gauge on another manway, recoating the tank exterior, replacing collision barriers, and constructing a catwalk the full length of the tank, plus replacing audible and visual alarms. The remote containment basin drainage pipe will be repaired and sloped toward the drain inlet/manhole, and asphalt near the fueling facility will be repaved to improve stormwater drainage, with concrete installed in the refueler parking area.
Additional tasks include replacing the dispenser fuel monitor with a non-coalescing filter and installing a hand-pumped water draw-off system; in the truck offload area, some asphalt will be replaced with concrete to prevent degradation from fuel spills; the POL building will be replaced in kind at the same location; the automatic tank gauge (ATG) system will be upgraded from Veeder Root TLS-350 Plus to TLS-450 Plus; and the generator inside the compartment will be relocated outside.
This project involves modifying a 12,000-gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside.
From Sources Sought posted on Dec 18, 2025Notice history
1-
Sources Sought LATEST Posted Dec 18, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
95655