Contacts, documents and full notice history are available with a subscription.
Sources Sought SBA Expired 2 notices 1 document

Material Handling Equipment (MHE) W911RX25RA003

Solicitation W911RX25RA003 Copied Notice ID 34f50ed2a1d342cda1f0f3ad35c27050 Copied DEPT OF DEFENSE — W6QM MICC-FT RILEY
SAM.gov
Posted
Feb 26, 2026
Deadline
Mar 13, 2026
Set-aside
SBA
NAICS
484110
PSC
W036

Summary

AI-generated · Feb 27, 2026

Provide rental and leasing of Material Handling Equipment (MHE) with operators to support operations around Fort Hood, TX. Equipment must handle containerized and non-containerized loads, from under 10,000 pounds up to 300 tons; shipping containers range from quad-con to 20-foot sizes and can weigh up to 58,000 pounds. Non-containerized gear includes armored military vehicles. The contractor must be able to upload and download containerized equipment onto government-operated vehicles or government-contracted transportation at multiple locations on and around Fort Hood (locations to be determined at the task-order level, including unit motor pools, deployment readiness facilities, and a rail operations center). Contractors may select MHE from their own fleet to meet the requirements, and a Contracting Officer’s Representative will be appointed for each MATOC.

The procurement will use a multiple-award Indefinite Delivery Contract with a Lowest-Price Technically Acceptable evaluation, and the government will not exercise supervision or control over the contractors. A draft Performance Work Statement is attached, and a draft Request for Proposals will be issued to solicit industry feedback; the final RFP will follow after that feedback.

This Notice is a Synopsis of a proposed contract action and satisfies the requirement prescribed in FAR 5.201. Mission and Installation Contracting Command Fort Riley, Kansas (MICC-Riley) is procuring Material Handling Equipment (MHE) Rental and Leasing Services on behalf of Fort Hood, Texas. All services will occur on and around Fort Hood, Texas. A continuing need is anticipated for MHE services. The acquisition will be procure utilizing FAR Part 12, Acquisition of Commercial Products and Commercial Services; FAR Part 15, Contracting by Negotiation; FAR Subpart 16.5, Indefinite Delivery Contracts and FAR Subpart 19.5, Total Small Business Set-Asides, Partial Set-Asides, and Reserves. The requirement will be 100% set-aside for Small Business and result in Multiple Award Task Order Contracts (MATOC). Multiple awardees are anticipated. The period of performance shall be for a one-year base period and four (4) 12-month option periods beginning early 3rd Quarter Fiscal Year 2026. Service Contract Act Wage Determination for Bell County, TX will be in effect. The Government anticipates utilizing the Lowest-Price Technically Acceptable (LPTA) Source Selection method in accordance with FAR 15.101-2. The Government will not exercise any supervision or control over the contract service providers. The contractor shall provide operators and MHE capable of loading containerized and non-containerized equipment ranging in weight from less than 10,000 lbs. to no more than 300 Tons. Shipping containers will range from Quad-cons to twenty-foot shipping containers, not to exceed 58,000 pounds in weight. Non-containerized equipment will be armored military vehicles. As a Service Contract(s), a Contracting Officer s Representative (COR) will be appointed for each MATOC. The contractor shall provide the capability to simultaneously upload and download containerized equipment onto government operated vehicles and/or government contracted modes of transportation at multiple locations on and around Fort Hood, Texas. Specific locations will be determined at the Task Order-level, but include unit motor pools, a deployment readiness facility, and a rail operations center. Contractor may select MHE from their fleet as required to meet the specified requirement. The Government recommends 15,000 (15K) pound forklifts, 30,000 (30K) pound forklifts, 36,000 (36K) pound forklifts or higher, Removable Gooseneck (RGN) Truck and Trailer Heavy (150K lbs.), RGN Truck and Trailer Light (60Klbs), flatbed truck, a 115-ton and 300-ton crane to support the III Armored Corps and Fort Hood, TX. The draft Performance Work Statement (PWS) is attached for reference. The Government intends to issue a draft Request for Proposals in the month of March 2026. Upon feedback from industry, the Government will issue the actual Request for Proposals not earlier than March 20, 2026.

From Presolicitation posted on Feb 26, 2026

This Draft Request for Proposal (DRFP) is issued by the Mission and Installation Contracting Command (MICC) - Fort Riley KS for Fort Hood solely for market research and acquisition planning purposes. This document does not constitute a formal solicitation (RFP) or a promise to issue a solicitation in the future." Non-Binding Nature: "The Government is not seeking or accepting competitive proposals at this time, and no contract award will result from this posting. Any costs incurred by interested parties in responding to this Draft RFP are the sole responsibility of the responder; the Government will not provide reimbursement for any costs associated with this request." Industry Feedback Objective: "The purpose of this Draft RFP is to solicit industry feedback, comments, and suggestions regarding the Performance Work Statement (PWS), evaluation criteria, and contract structure to improve the clarity and feasibility of the final requirement." This is a non-personal services contract toprovide Material Handling Equipment (MHE) for III AC & Fort Hood, Texas. Thecontractor shall provide all personnel, equipment, supplies, transportation, tools,materials, supervision, fuel, and other items necessary to perform movements of UnitEquipment, (except as otherwise noted in the specific Task Order (TO) and perform allwork in strict accordance with the subsequent task orders as defined in the PWS,required for this MATOC. The MATOC is for Material Handling Equipment at Fort Hood,TX and surrounding areas, not to exceed 100-mile radius. The contractor shall providethe capability to simultaneously upload and download containerized equipment acrossseveral battalion footprints, when necessary and established at the TO level. Locationsalso include the wash rack, line haul site, Deployment Ready Reaction Field (DRRF)and the Rail Operations Center (ROC) to support operations throughout the III ACfootprint. Services provided under this action will be in support of deployment,redeployment operations and in certain circumstances will require 24 hours ofcontinuous operations, which will be identified at the TO level. During the contractperiod, the Government will identify tasks required to complete each specific job and willissue Requests for Task Order Proposals (RTOP) to all the MATOC Contractors. TheContractor(s) shall be required to furnish all materials, equipment, and labor necessaryto manage and accomplish the TO(s).

From Sources Sought posted on Mar 06, 2026

Notice history

2
  1. Presolicitation Posted Feb 26, 2026
  2. Sources Sought LATEST Posted Mar 06, 2026
    • Title: Material Handling Equipment (MHE)Draft RFP MHE
    • Description: Description was updated
    • Notice Type: PresolicitationSources Sought
    • Response Deadline: Mar 13, 2026Mar 25, 2026

Details

Solicitation number W911RX25RA003
Notice ID 34f50ed2a1d342cda1f0f3ad35c27050
Notice type Presolicitation
Product / Service (PSC) W036
NAICS 484110
Place of performance Fort Hood, Texas
Archive date Mar 28, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Shannon S Campbell

Email

Phone

secondary
Christopher Richie

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
W6QM MICC-FT RILEY

Place of Performance

Fort Hood, Texas 76544
USA

Dates

Posted Feb 26, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago
Due Mar 13, 2026 4 months ago