Mass Storage Device - COMET FA2318-26-F-0XXX
Summary
AI-generated · Aug 23, 2025Provide a centrally managed mass storage solution for the USAF Mission Planning Systems program (Project: Comet): a secure Network Attached Storage device with essential peripherals, offering strong data protection, user access controls, and network connectivity to authorized clients to support critical mission planning data. Two End Item configurations are required: End Item A in a reusable transit case and End Item B in a durable cardboard box, both including the storage device and peripherals. Vendors must meet stringent security requirements and deliver a ready-to-deploy solution; refer to the attached SOW for technical requirements and the RFI for response instructions.
Questions and RFI responses follow the stated deadlines, and all communications must include the designated Contracting Officer and Contract Specialist and be conducted via email (no phone calls). Ensure emails are sent to all designated points of contact to avoid delayed responses. No changes have been noted between notices; both describe the same requirement and timelines.
The United States Air Force (USAF) is seeking vendors to provide a centrally managed mass storage solution for its Mission Planning Systems (MPS) program. This initiative, "Project: Comet," requires a secure and reliable Network Attached Storage (NAS) device ("The Device") bundled with essential peripherals and accessories. The solution must offer robust data protection, user access controls, and network connectivity to authorized clients, ensuring the efficient management of critical mission planning data. The USAF requires two End Item configurations: one packaged within a reusable transit case (End Item A), and the other within a durable cardboard box (End Item B), both including the mass storage device and associated peripherals. Interested vendors should be prepared to meet stringent security requirements and provide a comprehensive, ready-to-deploy solution for this vital component of USAF aircraft operations. See attached Statement of Work (SOW) for the technical requirements for this effort as well as RFI for instructions on responding. All questions are due on or before 12:00 PM Eastern Standard Time, Wednesday, 25 June 2025.Answers will be posted to GPE not later than COB, Tuesday, 1 July 2025.RFI responses are due on or before 12:00 PM Eastern Standard Time, Thursday, 10 July 2025. Additional questions may be submitted to the Contracting Officer, Cody Sheehan and Contract Specialist, Capt.Uibin Kim. All communications must include the PCO and Contract Specialist and may only be made via email; no phone calls will be accepted. If emails are not sent to all designated Points of Contact (POCs), as specified,there is a risk that they may not be received or responded to in a timely manner.
From Sources Sought posted on Jun 18, 2025The United States Air Force (USAF) is seeking vendors to provide a centrally managed mass storage solution for its Mission Planning Systems (MPS) program. This initiative, "Project: Comet," requires a secure and reliable Network Attached Storage (NAS) device ("The Device") bundled with essential peripherals and accessories. The solution must offer robust data protection, user access controls, and network connectivity to authorized clients, ensuring the efficient management of critical mission planning data. The USAF requires two End Item configurations: one packaged within a reusable transit case (End Item A), and the other within a durable cardboard box (End Item B), both including the mass storage device and associated peripherals. Interested vendors should be prepared to meet stringent security requirements and provide a comprehensive, ready-to-deploy solution for this vital component of USAF aircraft operations. See attached Statement of Work (SOW) for the technical requirements for this effort as well as RFI for instructions on responding. All questions are due on or before 12:00 PM Eastern Standard Time, Wednesday, 25 June 2025.Answers will be posted to GPE not later than COB, Tuesday, 1 July 2025.RFI responses are due on or before 12:00 PM Eastern Standard Time, Thursday, 10 July 2025. Additional questions may be submitted to the Contracting Officer, Cody Sheehan and Contract Specialist, Capt.Uibin Kim. All communications must include the PCO and Contract Specialist and may only be made via email; no phone calls will be accepted. If emails are not sent to all designated Points of Contact (POCs), as specified,there is a risk that they may not be received or responded to in a timely manner.
From Sources Sought posted on Jul 01, 2025Notice history
2-
-
Sources Sought LATEST Posted Jul 01, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA