Mark Twain NF Beaver Lake Dam Rehabilitation 12363N26Q4161
Summary
AI-generated · May 23, 2026Beaver Lake Dam rehabilitation at Mark Twain National Forest requires making improvements to draw down water levels as needed, clear and grub the site, excavate and remove the existing overflow conduit and related appurtenances, and repair spillway erosion using riprap. The project focuses on restoring dam safety and spillway function by removing outdated overflow components and stabilizing eroded spillway areas with rock armor.
MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING SPILLWAY EROSION WITH RIPRAP.
From Combined Synopsis/Solicitation posted on May 22, 2026MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING SPILLWAY EROSION WITH RIPRAP.
From Combined Synopsis/Solicitation posted on Jun 01, 2026MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING SPILLWAY EROSION WITH RIPRAP.
From Combined Synopsis/Solicitation posted on Jul 14, 2026Notice history
3-
Combined Synopsis/Solicitation Posted May 22, 2026
-
Combined Synopsis/Solicitation Posted Jun 01, 2026No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Jul 14, 2026View changes (1)
- Response Deadline: Jun 30, 2026 → Jul 20, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA