Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 8 documents

Malheur National Forest Trail Maintenance 1240BK25Q0092

Solicitation 1240BK25Q0092 Copied Notice ID ac8707e983704579a756abcba3a95957 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA NORTHWEST 1
SAM.gov
Posted
Sep 23, 2025
Deadline
Sep 29, 2025
Set-aside
SBA
NAICS
561730
PSC
F999

Summary

AI-generated · Sep 29, 2025

Trail maintenance is required within and adjacent to the Strawberry Mountain Wilderness area in the Malheur National Forest, covering eight wilderness trail segments and five non-wilderness trail segments. The contractor must furnish all personnel, supervision, materials, equipment, facilities, services, supplies, travel, transportation, training, and incidentals needed to perform deferred trail maintenance per USFS standards (Exhibits 1–7).

Work includes logout and brushing of the specified trail segments, removing downed and leaning trees, brushing woody vegetation encroaching on the trail corridor, and clearing debris from trail beds. Brushing must extend 4 feet from the centerline and up to 10 feet above the trail. Clearing operations include down logs and hazard trees, with stubs cut to ground level where possible, and trails cleared to standard trail clearing specifications. Whitebark pine within clearing limits has special specifications described in the technical requirements.

This requirement is for trail maintenance to be performed within and adjacent the Strawberry Mountain Wilderness area in the Malheur National Forest. Lines items involve logout and brushing of eight wilderness trail segments and five non-wilderness trail segments. The Contractor shall furnish the necessary personnel, supervision, material, equipment, facilities, services, supplies, travel, transportation, training, and incidentals to perform deferred trail maintenance. The line items require logout and brushing on the trail segments based on USFS standards (Reference Exhibits 1-7). This includes all downed and leaning trees, brushing of woody type vegetation encroaching on the trail corridor, and general clearing of debris from trail beds. Brushing is 4 feet from centerline of trail, 10 feet high. Clearing of down logs is the same, in addition to hazard trees. Cut stubs to avoid safety concerns where possible cut to ground level. Trails shall be cleared to standard trail clearing specifications. Whitebark pine within trail clearing limits have special specifications shown in technical requirements.

From Combined Synopsis/Solicitation posted on Sep 23, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Sep 23, 2025

Details

Solicitation number 1240BK25Q0092
Notice ID ac8707e983704579a756abcba3a95957
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) F999
NAICS 561730
Place of performance John Day, Oregon
Archive date Oct 14, 2025

Award Information

Not yet awarded

Contacts

primary
Kevin Flores

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA NORTHWEST 1

Place of Performance

John Day, Oregon 97845
USA

Dates

Posted Sep 23, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 29, 2025 10 months ago