MAJOR REPAIRS BOILER PLANT 70Z0G126BCGA003NP
Summary
AI-generated · Feb 12, 2026Renovate and upgrade the boiler plant at the U.S. Coast Guard Academy to provide a new kitchenette, restroom, shower, and locker facilities. Contractor to supply all labor, materials, equipment, and supervision, including removal of existing kitchen cabinets and toilet fixtures and portions of the concrete floor, wall preparation and waterproofing, plus construction of new walls, doors/frames/hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC, and electrical to support the new facilities.
Four optional scopes: Highland Tank Containment Area Renovations; Exterior Brick Masonry and Lintel Renovations; Exterior Stair, Wall, and Paving Renovations; and Force Sewer Main Relocation. All work must follow the project specifications and drawings, with applicable wage rates. The project is to be completed within a 12-month period from start.
MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 11, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 12, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 13, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 17, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 23, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Feb 24, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Mar 04, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Mar 12, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Mar 13, 2026MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland Tank Containment Area Renovations; Option 2: Exterior Brick Masonry and Lintel Renovations; Option 3: Exterior Stair, Wall, and Paving Renovations; and Option 4: Force Sewer Main Relocation. All work shall be accomplished in accordance with the Specifications for PSN 21590583 (612 pages), Drawings CC-1369 (27 sheets), and the applicable wage rates incorporated herein. THIS REQUIREMENT HAS A PERIOD OF PERFORMANCE FROM 6/1/2026 WITH A COMPLETION DATE NOT LATER THAN 6/1/2027.
From Solicitation posted on Mar 19, 2026Notice history
10-
Solicitation Posted Feb 11, 2026
-
Solicitation Posted Feb 12, 2026No changes from previous notice
-
Solicitation Posted Feb 13, 2026No changes from previous notice
-
Solicitation Posted Feb 17, 2026No changes from previous notice
-
Solicitation Posted Feb 23, 2026No changes from previous notice
-
Solicitation Posted Mar 04, 2026No changes from previous notice
-
Solicitation Posted Mar 13, 2026No changes from previous notice
-
Solicitation LATEST Posted Mar 19, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA