Contacts, documents and full notice history are available with a subscription.
Award Notice 2 notices

Maintenance, Repair, and Preservation of Bangor Caisson 1 Prime N4523A25R6002

Solicitation N4523A25R6002 Copied Notice ID c13fdf2c0f5f43f2884642f3cefd1c43 Copied DEPT OF DEFENSE — PUGET SOUND NAVAL SHIPYARD IMF
SAM.gov
Posted
Sep 30, 2025
Deadline
No deadline
Set-aside
None
NAICS
336611
PSC
J019

Summary

AI-generated · Aug 23, 2025

Maintain, repair, and preserve one Bangor Caisson 1 Prime under a stand-alone Firm-Fixed-Price contract. The caisson is a large steel-hull unit (approximately 108 ft 7 in long, 18 ft wide, 65 ft high; full displacement about 1,363 LT; max draft ~35 ft). The contractor’s facility must be located in and able to work from the Puget Sound region and capable of handling this asset. Coordinate with the Contracting Officer and COR to pickup, tow, transport to and from the contractor facility, then dock, wash, and clean the asset.

Scope of work includes interior and exterior coating renewal, replacement of non-skid, removal and replacement of PRC decking on the operations deck, removal and reinstallation of dewatering pumps and motors, replacement of gate and check valves and associated actuators and reach rod assemblies, replacement of interior and exterior zincs, replacement of port-side rubber seal and related tank/void work (opening, pumping, cleaning), replacement of lighting with LEDs, inspection of weather deck alarm lights and horn, replacement of weather deck safety light and foundation, ultrasonic testing of hull, weather deck, and tanks, repair of weather deck aprons, docking/undocking the Caisson, and performing dock and sea trials. This is a full and open competition; bidders must be SAM-registered.

20 June 2025- The purpose of amendment 0003 is to extend the proposal due date from 20 June 2025 at 12:00 PM PT to 27 June 2025 at 12:00 PM PT. 16 June 2025- The purpose of this amendment is to update the following: Attachment J-1 Statement of Work, Attachment J-2 Price Proposal Worksheet, Attachment J-6 Drawings and References, and Exhibit A CDRLs and DIDs as of 16 June 2025. Also, Attachment J-10 Declining Log has been removed. 5 June 2025- The purpose of amendment 0001 is to extend the RFC due date from 5 June 2025 at 12:00 PM PT to 12 June 2025 at 12:00 PM PT and the proposal due date from 13 June 2025 at 12:00 PM PT to 20 June 2025 at 12:00 PM PT. Also, the Attachment J-1 Statement of Work has been updated as of 5 June 2025. ________________________________________ The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), Bremerton, Washington intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of one (1) Bangor Caisson 1 Prime. The Bangor Caisson 1 Prime characteristics are length: 108FT -7IN, width: 18 FT, height: 65 FT, full displacement: 1,363 L TONS, maximum draft: 35 FT, and hull material: steel. The Contractors facility must possess the capability of one (1) Bangor Caisson 1 Prime with the dimensions as stated above. To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officers Representative (COR) to pickup, transport (tow) and deliver the asset to and from the Contractors facility. Upon docking asset, wash, and clean asset. Contractor is responsible to for the interior and exterior coating renewal; replacement of non-skid; remove existing and install new PRC decking on the operations deck; removal, repair and reinstallation of dewatering pumps and motors; removal of existing and installation of new gate and check valves and associated valve actuators and reach rod assemblies; replacement of interior and exterior zincs; removal of existing and installing new port side rubber seal, opening, pumping, and cleaning tanks and voids; removal of existing light bulbs and installation of new LED bulbs; inspection of weather deck alarm lights and audible horn; replace damaged and missing weather deck safety light and foundation; ultrasonic testing of hull, weather deck, and tank steel; repair weather deck aprons; dock and undock Caisson; and perform dock and sea trials. Desired Production Start Date: 12/16/2025. Desired Caisson Delivery/Completion Date: On or before 6/17/2026. Required Production Start Date: On or before 3/16/2026. Required Caisson Delivery/Completion Date: No Later Than 9/17/2026. Refer to clause 52.211-9 Desired and Required Time of Delivery regarding desired and required delivery information. This is full and open competition. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.

From Solicitation posted on Jun 20, 2025

Notice history

2
  1. Solicitation Posted Jun 20, 2025 View
  2. Award Notice LATEST Posted Sep 30, 2025

Details

Solicitation number N4523A25R6002
Notice ID c13fdf2c0f5f43f2884642f3cefd1c43
Award number N4523A25C1103
Notice type Award Notice
Product / Service (PSC) J019
NAICS 336611
Archive date Oct 14, 2025

Award Information

Awardee
1
Total Awarded
$13,096,386.79
Award Date
Sep 29, 2025

Awardees

Company Name UEI CAGE Code Location
EVERETT SHIP REPAIR LLC G1W7ESJQW8L1 8HJT6 Freeland, WA

Documents

No files available

View on SAM.gov

Contacts

primary
Jeff Jaeckel

Email

secondary
Christopher Campbell

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSEA
NAVSEA SHIPYARD
PUGET SOUND NAVAL SHIPYARD IMF

Dates

Posted Sep 30, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Sep 29, 2025 10 months ago