Maintenance Dredging of the Long Island Intracoastal Waterway Federal Navigation Project at Bellport Bay and Moriches Bay, Suffolk County, New York W912DS25BA011
Summary
AI-generated · Aug 24, 2025Maintenance dredging would remove about 30,000 cubic yards of sand from the Long Island Intracoastal Waterway at Bellport Bay and Moriches Bay, with placement along Cupsogue Beach County Park and/or Smith Point County Park shoreline. Dredging must reach -6 feet MLLW with up to 2 feet overdepth, and the material is primarily sand. Placement areas are roughly 1.25 to 4.5 miles from the dredging site. The work aims to alleviate shoaling, maintain the authorized project dimensions, and support safe, economical use by the U.S. Coast Guard and navigational boating; the dredged sand is planned for future shoreline stabilization at the two parks. A hydraulic cutterhead dredge is expected to be used, supported by multiple barges, tugboats, pipelines, and land-based equipment such as bulldozers, with all dredging and placement activities meeting applicable federal, state, and local requirements. After award, work must begin within five calendar days of notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day; dredging in the channel will affect vessel traffic, so the duration should be minimized.
The notices appear to be identical in scope and requirements, with no changes or new information indicated across records. The procurement is unrestricted and the project is estimated at $1,000,000 to $5,000,000; attachments include the solicitation plans, specifications, and a water quality survey.
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Jul 16, 2025The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Jul 31, 2025The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Aug 05, 2025The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Aug 08, 2025The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Aug 19, 2025The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Bellport Bay and Moriches Bay. The proposed maintenance dredging would remove approximately 30,000 cubic yards (CY) of sand with placement along the shoreline of Cupsogue Beach County Park and/or Smith Point County Park, subject to availability of funds. The placement areas are approximately 1.25 to 4.5 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for Cupsogue Beach County Park and/or Smith Point County Park. Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2025 and the proposed work is anticipated to take place between October 2025 and January 2026. Liquidated Damages of $2,722.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. Please see the attached Solicitation, Plans, Specs, and Water Quality Survey.
From Solicitation posted on Aug 20, 2025Notice history
6-
-
Solicitation Posted Jul 31, 2025No changes from previous notice
-
Solicitation Posted Aug 05, 2025No changes from previous notice
-
Solicitation Posted Aug 08, 2025No changes from previous notice
-
Solicitation Posted Aug 19, 2025No changes from previous notice
-
Solicitation LATEST Posted Aug 20, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA