Maint. Water Quality Measuring Devices W564KV-25-R-MWQMD
Summary
AI-generated · Aug 23, 2025Maintain water quality parameters per German and US drinking-water standards; measurement devices must be precisely calibrated and operable in accordance with the attached draft Performance Work Statement. This is market research for local-source providers under FAR 5.202, and not a formal solicitation at this time.
Respondents should address: (1) awareness of and ability to maintain the necessary certifications to comply with the PWS; (2) which price range among EUR 60,000–70,000, 70,000–80,000, or 80,000–90,000 is most realistic for LPTA; (3) any changes to the current CLIN structure (0001 MID s magnet inductive flowmeters, 0002 Devices burst & leak pipe detect & lab, 0003 Depolox, 0004 Unforeseen Repair Work IAW PWS Para.5.2.1); and (4) any other comments or information, including a valid email for future consideration.
The purpose of this Requirement is to maintain the water quality parameters given by German and US drinking water standards, the measurement devices must be precisely calibrated and operational IAW with the attached draft Performance Work Statement (PWS). This posting is for the purposes of Market research only. This requirement is intended for local sources IAW FAR 5.202. Please Answer the following Questions: Question 1: We anticipate an Lowest Price Technically Acceptable (LPTA) based on PWS paragraph 1.10 (d), other Water Management Act documents may apply in order to perform work on Water flowmeters. Is your Company aware of the necessary Certifications and are they able to maintain them in order to comply with the PWS? Question 2: Given the following price ranges based on the PWS which is the most realistic? EUR 60,000.00 - 70,000.00 EUR 70,000.00 - 80,000.00 EUR 80,000.00 - 90,000.00 Question 3: Based on the current CLIN structure, are there any changes that would better suit the requirement as specified in the PWS? 0001 MID s (Magnet inductive flowmeters) Job, FFP, FOB Destination 0002 Devices (burst & leak pipe detect & lab) Job, FFP, FOB Destination 0003 Depolox, Job, FFP, FOB Destination 0004 Unforeseen Repair Work (IAW PWS Para.5.2.1), Job, T&M, FOB Destination Question 4: Are there any other comments and/or information you would like the Government to know regarding this requirement? Please leave a valid email address if you are interested in future consideration for this requirement. Thank you.
From Special Notice posted on Jun 02, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
DEU