AI-generated · Nov 12, 2025Furnish all labor, materials, transportation, overhead, insurance, bonding, safety oversight, quality-control oversight, supervision, and equipment required to complete the P-F3 to P-F4 15 kV cable installation for the FESS Project 3-7-103B, in accordance with the Statement of Work and Drawing Set for this project. Work must follow the referenced specification sections—General Requirements, FRA Environment, Safety, and Health Requirements, Submittals, and Quality Requirements—and all related drawings and documents attached to and incorporated into this Solicitation.
The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B dated November 3, 2025 and Drawing Set entitled P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7-103B, dated October 2025, Specification Sections 010010 General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 Submittals (January 2025), Section 014100 Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.
From Solicitation posted on Nov 11, 2025On 12/4/2025, Amendment 02 was issued to provide REVISED responses to some questions issued in Amendment 01, replaced the Revised Exhibit R- Proposal Form issued with Amenment 01, and Replaced Revised Drawing No.'s 3-7-103-B_E-5 and 3-7-103-B_E-10 issued in Amenment 01 with new revised drawings. See attached files for more information. On 12/4/2025, Amendment 01 was issued to Replace Exhibit R- Proposal form, Replace Drawing No.'s 3-7-103-B_E-1A, 3-7-103-B_E-5, and 3-7-103-B_E-10 with Revised drawings, and to provide responses to questions from prospective offerors. See atatched files for more information. The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B dated November 3, 2025 and Drawing Set entitled P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7-103B, dated October 2025, Specification Sections 010010 General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 Submittals (January 2025), Section 014100 Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.
From Solicitation posted on Dec 04, 2025On 12/11/2025, Amendment 03 was issued to extend the proposal due date to 4pm CT on December 17, 2025. See atatched file for more information. On 12/4/2025, Amendment 02 was issued to provide REVISED responses to some questions issued in Amendment 01, replaced the Revised Exhibit R- Proposal Form issued with Amenment 01, and Replaced Revised Drawing No.'s 3-7-103-B_E-5 and 3-7-103-B_E-10 issued in Amenment 01 with new revised drawings. See attached files for more information. On 12/4/2025, Amendment 01 was issued to Replace Exhibit R- Proposal form, Replace Drawing No.'s 3-7-103-B_E-1A, 3-7-103-B_E-5, and 3-7-103-B_E-10 with Revised drawings, and to provide responses to questions from prospective offerors. See atatched files for more information. The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B dated November 3, 2025 and Drawing Set entitled P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7-103B, dated October 2025, Specification Sections 010010 General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 Submittals (January 2025), Section 014100 Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.
From Solicitation posted on Dec 11, 2025Notice history
3-
-
Solicitation LATEST Posted Dec 11, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Dec 11, 2025 → Dec 17, 2025
Details