M500 Water Main Replacement, Maxwell AFB PNQS2603400002
Summary
AI-generated · Mar 14, 2026Contractor shall furnish all labor, materials, and equipment necessary to perform the M500 Water Main Replacement at Building 500, Maxwell AFB, AL (Project PNQS260340). Estimated construction value ranges from $200,000 to $250,000.
Proposals will be evaluated using Lowest Price Technically Acceptable or Trade-off, as determined by the Contracting Officer. Davis-Bacon wage rates apply (WD#: AL260093). Only firms located within 250 miles of Maxwell AFB may bid. Submit proposals to the designated POC and alternate POC via email.
Contractor shall furnish all labor, materials and equipment necessary to perform all work in connection with Project number PNQS260340 M500 Water Main Replacement Bldg 500 at Maxwell AFB, Alabama . The Magnitude of Construction is between $200,000 and $250,000. Proposals will be evaluated using Lowest Price Technically Acceptable or Trade-off as determined by the Contracting Officer. The applicable wage rate for this project is Davis Bacon Act WD#: AL260093. This is a Total Small Business Set Aside and contractor must be located within 250 mile radius of Maxwell AFB. This is a Solicitation. Please submit your proposals to the POC and alternate POC via email.
From Solicitation posted on Mar 13, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA