M500 Water Main Replacement, Maxwell AFB PNQS2603400001
Summary
AI-generated · Mar 10, 2026Furnish all labor, materials, and equipment to replace the M500 water main at Building 500, Maxwell AFB, Alabama (project PNQS260340). Estimated construction value is $200,000 to $250,000. Proposals will be evaluated on a Lowest Price Technically Acceptable basis or via trade-off, as determined by the Contracting Officer. Davis-Bacon wage rates apply (WD#: AL260093).
Only qualified small businesses located within 250 miles of Maxwell AFB may bid. Proposals must be submitted by email to the designated POC and alternate POC.
Contractor shall furnish all labor, materials and equipment necessary to perform all work in connection with Project number PNQS260340 M500 Water Main Replacement Bldg 500 at Maxwell AFB, Alabama . The Magnitude of Construction is between $200,000 and $250,000. Proposals will be evaluated using Lowest Price Technically Acceptable or Trade-off as determined by the Contracting Officer. The applicable wage rate for this project is Davis Bacon Act WD#: AL260093. This is a Total Small Business Set Aside and contractor must be located within 250 mile radius of Maxwell AFB. This is a Solicitation. Please submit your proposals to the POC and alternate POC via email.
From Solicitation posted on Mar 09, 2026Notice history
1-
Solicitation LATEST Posted Mar 09, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA