LXEZ201076 Repair Water Lines Around Airfield, II FA527025CC002
Summary
AI-generated · Oct 09, 2025Design-build contract to replace the airfield water distribution system at Kadena Air Base, Okinawa. Replace 16-inch and 12-inch mains along a new route within roadway rights-of-way to remove distribution mains from flightlines, install new fire hydrants per UFC and NFPA standards, and provide connections to existing distribution mains and service lines feeding current facilities. Include new pressure-reducing valve systems to balance pressure and flows. For sections crossing runways, trench the existing mains (abandon in place) and fill with flowable structural concrete, then backfill to grade; other mains would be abandoned in place.
A Cultural Assessment Survey is required for all new water main routes. Details are described in Section 8 of the SOW. The project must incorporate sustainable, life-cycle cost-effective practices in design, development, and construction per UFC 1-200-02 High Performance and Sustainable Building Requirements. Awarded to Kyunan Co., Ltd.
AWARD NOTIFICATION: Contract no. FA527025CC002 for Project/Title no. LXEZ201076; Repair Water Lines Around Airfield, Phase II, Kadena Air Base, Okinawa, Japan was awarded to Kyunan Co., Ltd. DESCRIPTION OF WORK: This is a design-build project with the purpose of replacing the existing water distribution mains. This project will include replacing the 16-inch and 12-inch water mains along a new route within the roadway right of way to eliminate the distribution mains running through the flightlines. New fire hydrants will be installed along the proposed alignments in accordance with the UFC and NFPA requirements, providing water main connections onto existing distribution mains and service lines that feed the current facilities, and providing new pressure reducing valve systems to balance the water distribution network s pressure and flows. Proposed repairs to lines running through the runways include trenching the existing mains (abandon in place) and filling with flowable structural concrete, then backfill to existing grade with excavated material. Other existing mains will be abandoned in place. A Cultural Assessment Survey will be conducted on all new water main routes. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.
From Award Notice posted on Sep 30, 2025Notice history
1Details
Award Information
Award Notices
Posted: Sep 30, 2025
AWARD NOTIFICATION: Contract no. FA527025CC002 for Project/Title no. LXEZ201076; Repair Water Lines Around Airfield, Phase II, Kadena Air Base, Okinawa, Japan was awarded to Kyunan Co., Ltd. DESCRIPTION OF WORK: This is a design-build project with the purpose of replacing the existing water distribu...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| KYUNAN CO., LTD. | GATFXWPK2H83 | JS794 | Miyakonojo |
Contacts
Agency
Place of Performance
JPN