LTUY242043 Repair Building 28 Sprinkler Pipes W50S8K25RA004
Summary
AI-generated · Aug 24, 2025Repair of the Building 28 dry fire sprinkler distribution piping at Jefferson Barracks ANGS requires a single firm-fixed-price contract for all plant, labor, transportation, materials, tools, equipment, appliances, and supervision to replace four sections of 4-inch black iron piping in the attic and one section in the lower level that are leaking, with supporting components. Work includes inspections and a punch list, and the duration is 60 calendar days after notice to proceed (negotiable for punch-list completion). The project budget is around $16,000 and the overall scope is under $25,000.
Procurement uses Simplified Acquisition Procedures; bidders must be SAM-registered and obtain the solicitation and plans from SAM.gov. A pre-proposal site visit is planned (with a sign-in sheet added to attachments). A wage determination has been added to the attachments as of August 12, 2025, and certain table-of-contents sections are noted as N/A and will be removed in a future amendment. Amendments, including corrections discussed at the site visit (e.g., pipe type), will be issued via SAM.gov after all RFIs are resolved.
The 131st Mission Support Group contracting office intends to issue a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the repair of the fire sprinkler distribution pipe system in Building 28, Jefferson Barracks Air National Guard Station (ANGS). Repairs include four sections of 4 inch black iron piping in the attic as well as one section in the lower level that have active leaks and need replacement along with supporting components. This is for a dry system. The contract duration will be 60 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between less than $25,000. The Government's budget for this project is $16,000. The tentative date for issuing the solicitation is on-or-about 5 August 2025. A pre-proposal conference and site visit will be scheduled when the solicitation is issued. Interested contractors are encouraged to attend and shall follow registration and base access requirements shown in the solicitation. Interested contractors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non- Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
From Presolicitation posted on Jul 09, 2025The 131st Mission Support Group is issuing a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the repair of the fire sprinkler distribution pipe system in Building 28, Jefferson Barracks Air National Guard Station (ANGS). Repairs include four sections of 4 inch black iron piping in the attic as well as one section in the lower level that have active leaks and need replacement along with supporting components. This is for a dry system. The contract duration will be 60 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between less than $25,000. The Government's budget for this project is $16,000. See the solicitation document for information on the site visit and how to register. Interested contractors must be registered in the System for Award Management (SAM) to submit an offer. To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non- Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
From Solicitation posted on Jul 31, 2025The 131st Mission Support Group is issuing a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the repair of the fire sprinkler distribution pipe system in Building 28, Jefferson Barracks Air National Guard Station (ANGS). Repairs include four sections of 4 inch black iron piping in the attic as well as one section in the lower level that have active leaks and need replacement along with supporting components. This is for a dry system. The contract duration will be 60 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between less than $25,000. The Government's budget for this project is $16,000. See the solicitation document for information on the site visit and how to register. Interested contractors must be registered in the System for Award Management (SAM) to submit an offer. To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non- Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Update 12 August 2025: Wage determination added to attachments. Please note - sections 00 20 00 and 00 22 00 listed in the solicitation table of contents are "N/A" for this solicitation and will be removed in a future amendment.
From Solicitation posted on Aug 12, 2025The 131st Mission Support Group is issuing a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the repair of the fire sprinkler distribution pipe system in Building 28, Jefferson Barracks Air National Guard Station (ANGS). Repairs include four sections of 4 inch black iron piping in the attic as well as one section in the lower level that have active leaks and need replacement along with supporting components. This is for a dry system. The contract duration will be 60 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between less than $25,000. The Government's budget for this project is $16,000. See the solicitation document for information on the site visit and how to register. Interested contractors must be registered in the System for Award Management (SAM) to submit an offer. To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non- Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Update 12 August 2025: Wage determination added to attachments. Please note - sections 00 20 00 and 00 22 00 listed in the solicitation table of contents are "N/A" for this solicitation and will be removed in a future amendment. Update 21 August 2025: Sign-in sheet from the pre-proposal site visit added to attachments. The pipe type was discussed at the site visit and will be corrected in an amendment following receipt of all RFI.
From Solicitation posted on Aug 21, 2025The 131st Mission Support Group is issuing a Request for Proposal (RFP) using Simplified Acquisition Procedures to award a single firm-fixed price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervison necessary for the repair of the fire sprinkler distribution pipe system in Building 28, Jefferson Barracks Air National Guard Station (ANGS). Repairs include four sections of 4 inch black iron piping in the attic as well as one section in the lower level that have active leaks and need replacement along with supporting components. This is for a dry system. The contract duration will be 60 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between less than $25,000. The Government's budget for this project is $16,000. See the solicitation document for information on the site visit and how to register. Interested contractors must be registered in the System for Award Management (SAM) to submit an offer. To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non- Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see History section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Update 12 August 2025: Wage determination added to attachments. Please note - sections 00 20 00 and 00 22 00 listed in the solicitation table of contents are "N/A" for this solicitation and will be removed in a future amendment. Update 21 August 2025: Sign-in sheet from the pre-proposal site visit added to attachments. The pipe type was discussed at the site visit and will be corrected in an amendment following receipt of all RFI. Update 3 September 2025: Amendment 1 with updated SOW changing pipe schedule to 40 and RFI responses added to attachments. Due date extended to 5 September at 10AM local.
From Solicitation posted on Sep 03, 2025Notice history
5-
-
Solicitation Posted Jul 31, 2025View changes (4)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Not set → Sep 04, 2025
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Solicitation LATEST Posted Sep 03, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 04, 2025 → Sep 05, 2025
Details
Award Information
Not yet awarded